Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Hollow Rock, Tennessee. Completed plans call for site work for a water / sewer project.
As of March 20, 2024, this project has not yet been awarded. A timeline or award has not yet been established. Any person with a disability requiring special accommodation must contact the Town of Hollow Rock no later than 7 days prior to the bid opening. The work to be bid on is as follows: o Replacement of 380 water meters and meter boxes with drive-by remote read meters. o The allotted time for construction is 90 calendar days for meter replacement. This project is being supported with the Treasury, Coronavirus State and Local Recovery Fund grant funding. Therefore, certain restrictions and other federal requirements attach to this opportunity. Any non-winning bidder or non-bidder, upon returning the CONTRACT DOCUMENTS after BID opening and in good condition, will be refunded his/her payment. The Town of Hollow Rock hereby notifies all bidders that it will affirmatively ensure that in any contract entered pursuant to this advertisement will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. The Town of Hollow Rock is an Equal Opportunity Employer. Any contract that uses federal funds to pay for construction work is a "federally assisted construction contract" and must include the equal opportunity clause found in 2 C.F.R. Part 200, unless otherwise stated in 41 C.F.R. Part 60. We encourage all small and minority owned firms and women's business enterprises to participate. No bidder may withdraw his bid within (60) days after the actual date of the opening thereof. All bidders are required to be licensed in accordance with the General Licensing Act of 1976 (TCA Title 62, Chapter 6), also known as House Bill No. 2180. The Copeland "Anti-Kickback" Act is also applicable, which prohibits workers on construction contracts from giving up wages that they are owed. Contractors must not appear on the Sam.gov debarment list. A detailed listing of all subcontractors shall be provided by the Bidder. In accordance with the Contract Documents, documentation that the prospective General Contractor and its subcontractors meet minimum qualifications shall be provided and submitted. Subcontractors must also not appear on the Sam.gov disbarment list. Mark-ups on subcontractor work or Cost Plus Overhead will be disallowed for reimbursement. A bid bond or certified check for five percent (5%) of the total bid amount must accompany each bid. The successful bidder will be required to furnish a performance bond in the amount of his bid and shall, before entering on the work of said contract, be licensed as a contractor of the Town of Hollow Rock. The owner reserves the right to waive any informalities or to reject any or all bids.
Bid Results
Water / Sewer
$525,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2024
April 15, 2024
Multiple Locations, Hollow Rock, TN
Related To This Project
Hollow Rock, TN
Bid Date: May 22 2024
Hollow Rock, TN
Bid Date: Oct 28 2024
Hollow Rock, TN
Bid Date: Mar 08 2023
Morristown, TN
Bid Date: Mar 22 2024
Johnson City, TN
--
Memphis, TN
Bid Date: Feb 26 2024
Chattanooga, TN
Bid Date: Feb 29 2024
Chattanooga, TN
Bid Date: Mar 19 2024
Dover, TN
Bid Date: Mar 01 2024
Maryville, TN
Bid Date: Jun 22 2021
Tullahoma, TN
Bid Date: Feb 28 2024
Murfreesboro, TN
Bid Date: Mar 01 2024
Bristol, TN
--
Chattanooga, TN
Bid Date: Mar 14 2024
Springfield, TN
Bid Date: Mar 12 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.