Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a road / highway in McKinney, Texas. Completed plans call for site work for a road / highway.
For Ps&e Package Questions Call: Christopher Blain 4777 East Highway 80 Mesquite, Tx 75150 214/320-6236 Length: 0.90 Mi Time for Completion: 160 Working Days For Questions Regarding a Proposal Call 512/416-2498 County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Collin 0047-14-091 Us 75 at Outer Loop/ Foster Crossing Us 75 F 2b24(016) in the City of Anna Length: Miles Collin 0091-03-032 Sh 289 at Legacy Dr Sh 289 F 2b24(016) in the City of Celina Length: Miles Collin 0280-02-047 Sh 78 at Fm 981 Sh 78 F 2b24(016) in the City of Blue Ridge Length: Miles Denton 1315-01-034 Crutchfield Rd Fm 1385 F 2b24(016) Fm 428 W Length: 0.90 Miles The disturbed area for this project, as shown on the plans is 0.0858 acres (US 75 at Outer Loop / Foster Crossing), 0429 acres (SH 289 at Legacy Dr), .0429 acres (SH 78 at FM 981), .0858 (FM 1385 at FM 428 and FM 1385 at Crutchfield) However, the Total Disturbed Area (TDA) will establish the required authorization for storm water discharges. The TDA of this project will be determined by the sum of the disturbed area in all project locations in the contract, and all disturbed area on all Project-Specific Locations (PSL) located in the project limits and/or within 1 mile of the project limits. TX DOT - Install Traffic Signal - US 75 Questions may be submitted via the Letting Pre-Bid Q&A web page. This webpage can be accessed from the Notice to Contractors dashboard located at the following Address: https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors or Contractor questions on this project are to be addressed to the following individual(s): Engineer's Email: Christopher.Blain@txdot.gov Construction Manager's Email: Eric.Herman@txdot.gov Construction Record-Keeper's Email: Anthony.Block@txdot.gov All contractor questions will be reviewed by the Engineer or Construction Manager. All questions and any corresponding responses that are generated will be posted through the same Letting Pre-Bid Q&A web page.
Award
Roads / Highways
$1,895,529.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2024
June 3, 2024
US-75, McKinney, TX
Related To This Project
McKinney, TX
Bid Date: Oct 15 2020
McKinney, TX
Bid Date: Mar 14 2024
McKinney, TX
--
McKinney, TX
Bid Date: Mar 19 2024
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
Bid Date: Jan 21 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.