BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Fresno, California. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City of Fresno (CITY) Public Works Department is requesting Statements of Qualifications (SOQ) from qualified Civil Engineering firms to provide Engineering Services for the capital improvement project at Blackstone Avenue and Abby Street between Pine Avenue and SR-180. Funding for this project is through local funds. The scope of this project is: The Blackstone Mobility Project will construct Class IV bike lanes with raised median islands by implementing a road diet. The project will also construct sidewalks, ADA compliant curb ramps, install FAX/BRT bus stop platforms, landscape, and lighting. Geotechnical investigation will be required to assess the current pavement conditions. Traffic analysis will also be conducted to determine the feasibility of installing traffic signal or HAWK at the intersection of Blackstone and Floradora as well as a feasibility study to determine the closing of the left-turn pockets at Pine Street. Traffic signal modification to existing signalized intersections and incorporation of video detection system. Blackstone Avenue is within the Citys Intelligent Transportation System and is an adaptive synchronized corridor. SOQ must be postmarked by 2/27/2024, or will be timestamped upon receipt by Department of Public Works staff and must be received by, Tuesday, February 27, 2024 or earlier. Late submissions will not be accepted. Should you have any questions or require additional information, please contact Garine Kendoyan in writing by email at garine.kendoyan@fresno.gov. Phone calls will NOT be accepted. Pre-Bid Meeting: No Online Q&A: No Project Duration:May 2024 to May 2028 Scope of Services Services will include preparation of necessary plans, specifications, estimates and conducting necessary utility coordination for this project . In general: o Participate in coordination meetings with City Staff, FMFCD, Caltrans and any other agencies needed. o Participate in key stakeholders meetings (City, public, schools, etc.) o Prepare utility notification letters to various utilities and agencies. o Preparation of Utility Communication Log to be completed and updated with every submittal, or upon request of City Project Management Team. o Lead the effort on utility relocations, including preparing and submitting required documents to various agencies. o Prepare and submit utility research. o Prepare and provide pothole exhibit based on utility research and engineers' recommendation showing potential utility conflicts. o Conduct site investigation in order to prepare construction documents. o Process City provided topographic survey information. o Provide Geotechnical testing as required and propose innovative cost-saving recommendations. o Provide traffic study and analysis as required. o Prepare required right-of-way exhibits, deeds and maps showing required right-of-way acquisition. o Prepare appraisal maps detailing all acquisitions and any Temporary Construction Easements. o Prepare construction plans, technical specifications, and construction cost estimates at each phase of work identified in the consultant agreement. o Submitting construction documents for review to City offices, utilities/agencies, and obtaining final signatures on construction documents. o As part of the bidding phase, attend the pre-bid conference, prepare addenda and clarifications if necessary, and attend bid opening. o As part of the construction phase and general construction contract administration, attend the preconstruction conference, review shop drawings and other contractor submittals, provide clarification of construction documents during construction, review and provide technical information for construction contract change order requests if necessary, and perform as many as two site visits during construction. o Prepare record drawing documents using the as-built improvements. If your firm is interested in this project, please submit Four (4) copies of your Statement of Qualifications that includes the following: o Cover letter o Overview of the firm and any proposed sub-consultant firm experience o Summary of the prime consultant and any sub-consultant firm experience and performance on similar projects completed in the last five years, including references, resumes for the Project Manager and key support staff including education, relevant past project experience, applicable licensing & certifications, and description of their assignment on this project o Work plan for identifying tasks to be completed by the Consultant team, approach to the work, and key issues for this project. o Schedule for project completion including the milestones identified in the work plan. o Listing of client references associated with completed projects would be desirable. o Certificate of Local Preference, if applicable o Signed Addenda issued during advertisement o The SOQ should be concise and shall not exceed THIRTY-FIVE (35) pages The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$1,500,000.00

Public - City

Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
24
Bidding Soon
412
All Active Projects
203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2024

img_map_placeholder

E Floradora Ave & N Blackstone Ave, Fresno, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.