BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2024 at 8:00 PM

Updated May 29, 2024

Site work and paving for a mixed-use development in Plano, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and road / highway.

The City of Plano is soliciting for the reconstruction of the existing screening wall at various locations. Work performed for this screening wall replacement project shall include demolition of existing masonry screening walls and reinforced concrete foundation, construction of single and double wythe masonry screening walls and grade beams, tree protection of existing mature trees adjacent to the work area, demolition and reconstruction of existing sidewalk, reinstallation of existing entrance signs, and protection or reinstallation of existing entrance irrigation and lighting where applicable. This project is estimated at $5,744,717.00. Question Deadline 03/08/2024 at 2:00 PM CT Questions must be submitted electronically. No questions will be answered over the phone or through email. The location of this project is Park Boulevard at Daventry Drive, Parker Road at Jojoba Court, Independence Parkway from Val Verde to Charring Cross, 15th Street at Amazon Drive and 14th Street at Ridge Gate Drive in the City of Plano, Texas. A location map is included in the plans. CONTRACT TIME This project must reach TOTAL completion within 365 calendar days from the notice to proceed. See Section 2.4, Special Conditions, for further details. IMPORTANT: The amount for liquidated damages is anticipated to be $1,000.00 for each day work remains incomplete after the time specified. EVALUATION The lowest responsive, responsible bidder shall be awarded the contract The project consists of demolishing and replacing ten (10) existing screen walls along Independence Parkway, West Parker Road, 14 th Street, 15 th Street and West Park Blvd in Plano, Texas. The location and limits of the screen walls and the associated test borings for each wall are summarized in Table 1 below. It is understood that the screen walls will be supported by drilled shaft piers founded in unweathered rock.

Award

Roads / Highways

$4,890,893.00

Public - City

Paving, Site Work

225

11

4

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
384
Active Projects
134
Bidding Soon
3,987
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.