Demolition, site work and new construction of a municipal facility in Sorel-Tracy, Quebec. Design plans call for the demolition of a municipal facility; for the construction of a municipal facility; and for site work for a municipal facility.
Reconstruction of port infrastructure in Sorel-Tracy - Saint-Ignace-de-Loyola. The work will be carried out on one side of the river at a time. There will be three phases of work on each side: Phase 1: Construction of temporary facilities, including an abutment or jetty and a mobile boarding ramp installed on modular floating caissons. Phase 2: Demolition of existing infrastructure and construction of new infrastructure, including a garage wharf, a mobile ramp, and the ferry wharf. Phase 3: Commissioning of the new facilities, dismantling of the temporary facilities, and site restoration. The new wharves will be equipped with two ramps, which will improve the flow of boarding and disembarking. TIMELINE: Conceptual design and environmental assessment (EA) is underway and expected to be deposited for approvals in 2026. Construction start is anticipated in 2029. Further update in spring, 2026.
Design
Municipal
$170,000,000.00
Public - State/Provincial
Demolition, New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2029
9 Rue Elizabeth, Sorel-Tracy, QC
Related To This Project
Sorel-Tracy, QC
Bid Date: Feb 27 2024
Sorel-Tracy, QC
Bid Date: Mar 21 2024
Sorel-Tracy, QC
Bid Date: Mar 04 2024
Sorel-Tracy, QC
Bid Date: Mar 04 2024
Sorel-Tracy, QC
Bid Date: Mar 25 2024
Sorel-Tracy, QC
Bid Date: Apr 11 2024
Sorel-Tracy, QC
Bid Date: Apr 05 2024
Sorel-Tracy, QC
Bid Date: Jun 10 2024
Sorel-Tracy, QC
Bid Date: Mar 21 2024
Sorel-Tracy, QC
Bid Date: Mar 21 2024
Sorel-Tracy, QC
Bid Date: Mar 21 2024
Sorel-Tracy, QC
Bid Date: Mar 14 2024
Sorel-Tracy, QC
Bid Date: Mar 04 2024
Sorel-Tracy, QC
Bid Date: Feb 28 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.