BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 3, 2025

Demolition, site work and new construction of a municipal facility in Sorel-Tracy, Quebec. Design plans call for the demolition of a municipal facility; for the construction of a municipal facility; and for site work for a municipal facility.

Reconstruction of port infrastructure in Sorel-Tracy - Saint-Ignace-de-Loyola. The work will be carried out on one side of the river at a time. There will be three phases of work on each side: Phase 1: Construction of temporary facilities, including an abutment or jetty and a mobile boarding ramp installed on modular floating caissons. Phase 2: Demolition of existing infrastructure and construction of new infrastructure, including a garage wharf, a mobile ramp, and the ferry wharf. Phase 3: Commissioning of the new facilities, dismantling of the temporary facilities, and site restoration. The new wharves will be equipped with two ramps, which will improve the flow of boarding and disembarking. TIMELINE: Conceptual design and environmental assessment (EA) is underway and expected to be deposited for approvals in 2026. Construction start is anticipated in 2029. Further update in spring, 2026.

Design

Municipal

$170,000,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
56
Bidding Soon
2,634
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2029

Project location map

9 Rue Elizabeth, Sorel-Tracy, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.