BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a municipal facility in Sorel-Tracy, Quebec. Conceptual plans call for the demolition of a municipal facility; for the construction of a municipal facility; and for site work for a municipal facility.

Reconstruction of port infrastructure in Sorel-Tracy - Saint-Ignace-de-Loyola. TIMELINE: Contract for consulting services to complete an environmental impact study has been awarded. Reference number: 1802492. Request for proposals for a multidisciplinary team to complete design and monitor construction work is closed. Reference number: 1808718. Proposals have been deposited and are under review. Specialty(s) : Multidisciplinary team: Maritime engineering, Industrial mechanical engineering, Electrical engineering, Structural engineering, Civil engineering and Architecture. The Company is issuing a public call for tenders for professional services targeting the specialties: Maritime Engineering, Industrial Mechanical Engineering, Electrical Engineering, Structural Engineering, Civil Engineering and Architecture for the design (plans and specifications) and monitoring of the work for the contract mentioned in the title and the expected cost of the work is in the order of $170,000,000 The professional engineering and architectural services required include, but are not limited to, the preparation of models, plans and specifications and the estimation of construction costs at different stages of the project, advice on planning, monitoring and optimization parameters of content, quality, cost and authorized schedules, coordination of the deliverables of its engineering specialties with those of other professionals according to the integrated design (PCI) and building information modeling (BIM) processes. , monitoring of works, support for requests made to the various public authorities, as well as the analysis of equivalences, change requests, payment requests and complaints. According to the current project implementation scenario, the probable end date of the mandate is in February, 2033. Further update in late summer/fall, 2024.

Conceptual

Municipal

$170,000,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
119
Bidding Soon
1,626
All Active Projects
682
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2026

img_map_placeholder

9 Rue Elizabeth, Sorel-Tracy, QC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.