Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2024 at 8:00 PM

Updated May 2, 2024

Site work for a water / sewer project in Booneville, Mississippi. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: 1. 930 LF - 8" SEWER 2. 4 - MANHOLES 3. 1 - 12" DIRECTIONAL BORE 4. 1 - 4" DIRECTIONAL BORE 5. 600 CY - SELECT FILL 6. 930 LF - STONE BEDDING Obtaining the Bidding Documents The PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS may be examined at the following locations: Moore Engineering, 1204 N 2nd Street, Booneville, MS 38829 Information and Bidding Documents for the Project can be found at the following designated website: Mooreengplans.com Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. Minority and women's business enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities and equipment, material, and/or supply needs. Attendance at the pre-bid conference is encouraged but not required. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete the PROJECT within NINETY (90) consecutive calendar days thereafter. BIDDER further agrees to pay as liquidated damages, the sum of $250.00 for each consecutive calendar day thereafter as provided in Section 15 of the General Conditions.

Under Construction

Water / Sewer

$268,326.00

Public - City

Site Work

8

6

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
33
Bidding Soon
491
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

April 22, 2024

Project location map

Multiple Locations, Booneville, MS

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed