Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 19, 2024 at 8:00 PM
Updated March 26, 2024
Site work for a mixed-use development in Watson Lake, Yukon Territory. Completed plans call for site work for a bridge / tunnel.
The scope of work outlined in this RFQ encompasses construction and remediation activities. It involves developing a comprehensive plan to rectify identified deficiencies. Specific tasks include but are not limited to installing reinforcing steel, constructing cast-in-place approach slabs and curbs, specialized concrete repair operations, installing bridge guardrails and executing the removal and reconstruction of bridge end-fills. Additionally, the scope entails implementing bridge jacking and coordinating the resetting or replacement of pot-type bearings with manufacturer and supplier if required. Documents can be obtained from https://yukon.bidsandtenders.ca/
Post-Bid
Bridges / Tunnels
$1,000,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
