BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Taylor Lake Village, Texas. Conceptual plans call for site work for a water / sewer project.

The City of Taylor Lake Village is accepting bids for planning and implementing a drainage plan to alleviate standing water in multiple areas throughout the city park. The City of TLV has a 45-acre park with amenities, jogging trails, and trees which ultimately drain into Taylor Lake. Over the years the existing drainage ditches have partially been covered with silt. The City requires a comprehensive approach that ensures all areas drain effectively. The scope of the project should include all costs associated with job completion. Any excess dirt or silt can be stored on site. The actual work performed must be considerate of the people using the park during the implementation portion of the project. Hand-delivering or shipped Proposals & Mail: City of Taylor Lake Village RFQ 2024-01 PARK DRAINAGE 500 Kirby Taylor Lake Village, Texas 77586 The City of Taylor Lake Village further reserves the right to reject any or all bids, to waive technical or legal deficiencies, to re-bid, and to accept any bid that it may deem to be in the best interest of the City. Proposals must be received no later than 4:00 pm on February 29, 2024. It is the responsibility of the submitting entity to ensure that the proposal is received in a timely manner. Proposals received after the deadline will not be considered for award, regardless of whether or not the delay was outside the control of the submitting firm. Please submit one (1) hard copy of your bid for the proposed services to the address below: City of Taylor Lake Village Attn: Stacey Fields, City Administrator 500 Kirby Taylor Lake Village, TX 77586 Any questions or requests for clarification must be submitted in writing via EMAIL to the following address - city_secretary@tlv-tx.us at least 3 business days prior to the deadline. The city may, if appropriate, circulate the question and answer to all service providers submitted proposals. The Contract is expected to be awarded at the March 6, 2024, City Council meeting or soon thereafter as practical. The City of Taylor Lake Village reserves the right to reject any and all applications as the best interests of the City dictate.

Conceptual

Water / Sewer

$565,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
52
Bidding Soon
2,626
All Active Projects
1,011
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

img_map_placeholder

500 Kirby Blvd, Taylor Lake Village, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.