Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2024 at 8:00 PM

Updated March 14, 2024

Site work and paving for a road / highway in Plymouth, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Fog Sealing Site Directions: Location maps are included within the specifications. Direct inquiries to the Street Supervisor, Torrey Keith, at 763-509-5992 or tkeith@plymouthmn.gov. No questions will be answered within 48 hours of bid opening Scope-- The work to be done under this contract shall include the furnishing of all labor, materials, tools and equipment to perform the grading, soil stabilization, placement of aggregate base, bituminous surfacing, concrete curb and gutter, sidewalk, trails and all appurtenant construction as shown on the drawings and as specified herein. Water applied for grading and compaction of base material shall be incidental to the placement. NO CONCRETE WORK OR BITUMINOUS SURFACING SHALL BE PLACED BEFORE APRIL 15 TH OR AFTER OCTOBER 31 ST . Bituminous or concrete installation after October 31 st must receive approval from the City Engineer and if approved, the street warranty period will be extended one additional year for a total of two years. Any bituminous or concrete installed after October 31 st that fails any test or inspection shall be completely removed and replaced as directed by the City Engineer. Question Deadline Mar 08, 2024

Post-Bid

Roads / Highways

$460,000.00

Public - City

Paving, Site Work

10

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
107
Bidding Soon
1,774
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2024

July 1, 2024

Project location map

Multiple Locations, Plymouth, MN


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed