BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and addition to a fire / police facility in Saratoga Springs, Utah. Completed plans call for the addition of a fire / police facility; for the demolition of a fire / police facility; for the construction of a fire / police facility; and for site work for a fire / police facility.

As of April 24,2024 the project was awarded to The Will Group but no exact amount provided The City of Saratoga Springs desires to construct an addition to the existing South Fire Station building located at 2021 South Ring Road, Saratoga Springs, Utah. The City has retained the services of Think Architecture, Inc. for architectural design services and now seeks to retain the services of a Construction Manager as Constructor (CMC) firm to join the project team. The firm will be responsible for providing CMC services as required for Pre-Construction Phase and Construction Phase services for the project. Pre-Construction phase services will include scheduling, cost estimating, constructability analysis, construction phasing, and document reviews. Construction Phase services will include assembling a team of qualified subcontractors to work directly for the CMC, construction administration, and full responsibility for the successful completion of all construction. The purpose of this Request for Proposal (RFP) is to solicit sealed proposals and to establish a contract for the purchase of these services. This RFP sets forth the instructions for submitting proposals, the procedure and criteria by which the City will select one CMC firm, and the contractual terms by which the City proposes to govern the relationship between itself and the selected CMC firm. PROJECT SCOPE The addition to the Saratoga Springs South Fire Station is approximately 4,215 Gross SF/3,488 Net SF and is planned as a single story pre-fabricated metal building. The Floor Plan and Exterior Elevations of the South Fire Station addition are located in Section G - Attachments. The City has budgeted $800,000.00 for the Project. The budget includes building construction costs, on-site improvements, and a construction contingency. Closing Date for Questions on RFP is Friday, March 4, 2024 at 5:00 PM through UP3

Award

Fire / Police

$800,000.00

Public - City

Addition, Demolition, New Construction, Site Work

6

5

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
30
Bidding Soon
543
All Active Projects
251
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

April 8, 2024

img_map_placeholder

2021 Ring Rd, Saratoga Springs, UT


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.