BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a road / highway in Flagstaff, Arizona. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

Question Deadline 03/07/2024 at 2:30 PM MT Site(s) Location of the Project: Flagstaff, Arizona Lone Tree Campus - 2800 S. Lone Tree Road Fourth Street Campus - 3000 N. Fourth Street 1. Remove existing light bulbs and return to CCC. Refer to Exhibit 1 'Existing Lone Tree Light Bulbs and Fixtures' and Exhibit 2 'Existing Fourth Street Light Bulbs and Fixtures' for information pertaining to existing light bulbs and fixtures. 2. Furnish and install 'Dark Sky City'-certified and CCC-approved light bulbs within existing fixtures as identified under 'Specifications' within this Section, which are approximately 30 feet high at each Site. 3. The awarded contractor is to verify and provide submittals for approval all light bulbs and any associated accessories required for full functionality prior to ordering. 4. New LED light must fit inside current main body of current light fixture. CCC has provided light body size, but it is the contractor's responsibility to verify light body fixture. o Lone tree campus body fixture is ((L x W x H) 42 3/4 " x 14" x 8" o 4 th Street campus body of fixture is ((L x W x H) 36" x 9 1/2 " 5 1/2 " 5. Parking Lot at both campuses will be open during regular business hours. College summer hours are Monday thru Thursday 7:00am to 6:00pm and closed on Friday. Contractor can work during campus open hours but must work around car park during open hours. Least number of cars in parking lot at both campuses is May 13 th to June 3 rd . 6. Light install will start no earlier than May 13, 2024, and be completed by June 30, 2024. 7. At the conclusion of the project, provide verification that the newly installed light bulbs are operational. SPECIFICATIONS o Total Light Count: o Lone Tree Campus: 71 Lights o Fourth Street Campus: 32 Lights Note: It shall be the contractor's responsibility to verify light fixture count at both campuses. o 'Dark Sky City'-certified and CCC-approved light bulbs. Contractor must provide complete specifications of proposed light bulbs and any necessary accessories. o LED light will be a minimum of 5-year warranty and 50,000 life hours. Alternate 1 shall include pricing for a 10- year warranty and 10

Bid Results

Roads / Highways

$32,655.00

Public - County

Outdoor Lighting, Site Work

6

5

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
72
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2024

May 13, 2024

img_map_placeholder

Multiple Locations, Flagstaff, AZ


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.