Demolition, site work, renovation and addition to a fire / police facility in Apple Valley, Minnesota. Completed plans call for the addition of a fire / police facility; for the demolition of a fire / police facility; for the renovation of a fire / police facility; and for site work for a fire / police facility.
**As of April 19, 2024, the project was awarded to Rachel Contracting, LLC, in the amount of $165,637.00.** Envelopes containing bids must be sealed, marked City of Apple Valley Central Maintenance Facility & Police Operations Building and the Bid Category No. being bid with attention to Matt Saam - Public Works Director. The name and address of the Bidder must be shown on the outside of the envelope. The date and time of the bid is to be noted on the label. Bids received after this time will not be accepted and will be returned unopened. The project work scope consists of a renovation and expansion of the Central Maintenance Facility, new Fleet Maintenance Building, and a new Police Operations Building. Bid Package No. 2 is specific to the Police Operations Building located at the South end of the property and is to include all associated bid categories with the exception of Bid Category 3B Structural Precast Panels (furnish & install) Previously bid under Bid Package No. 1. For a detailed breakdown of bid categories, please reference specification section 01-11-50 Work Sequences and Bid Categories. A bid security in the amount of 5% of the base bid will be required to accompany bids. Bids received after that time will not be accepted and will be returned unopened. Bidding documents including the Proposal Form, Drawings and Specifications will be on file at the office of the Construction Manager: RJM Construction 830 Boone Avenue North Golden Valley, MN 55427 952-837-8600 A digital download of the documents will be available for purchase for access with check made payable to National Reprographics. They are also available at any of the building exchanges. Plans will be available on or about February 23, 2024. Make Bids in duplicate in exact accordance with the proposal form in the Project Manual, and sign in long-hand. No oral, telegraphic or fax bids will be accepted or considered. Combined bids including multiple bid categories will be accepted. However, in order to be considered, bidders must also submit separate individual bids in addition to the combined bid. Combined bids will not be accepted if individual bids are not submitted. Each separate bid or combined bid must appear alone on a bid form and submitted in separate envelopes. Submit with each bid a certified check, bank money order or acceptable bidders bond issued by a surety meeting city requirements payable to the City of Apple Valley in the amount equal to five percent (5%) of the total bid. For requirements, please reference specification section 00 21 00 - Supplementary Instructions to Bidders. All bids will be evaluated by the Owner, the Architect, and the Construction Manager. The Owner reserves the right to accept any bid or reject any or all bids, or parts of such bids and waive informalities or irregularities in bidding. Successful bidders will be required to furnish satisfactory Labor and Material Payment Bond, Performance Bond, and Certificates of Insurance and a signed contract within 10 days of award of contract. No bidder may withdraw his/her bid for at least 90 days after the scheduled bid opening. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes Section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. The schedule for the Police Department portion of the project is to commence work in early summer 2024 with substantial completion scheduled for spring 2025. Work will be completed according to the preliminary project construction schedule issued in the Bid Documents. Please direct all inquiries to Simon Midtbo, RJM Construction at 612-513-4201. Bid Results: 3D - Cast-In-Place Concrete - Police Station : Northland - $372,347 4B - Unit Masonry - Police Station : Northland Concrete - $78,477 3D & 4B - Cast-In-Place Concrete & Masonry - Police Station : Northland Concrete - $449,800 5A - Structural Steel & Misc. Metals Supply - Police Station : Construction Systems - $426,010 5B - Structural Steel & Misc. Metals Installation - Police Station : Industrial Construction - $162,989 6B - Carpentry Materials & Install "Building Works" - Police Station : Ebert - $243,300 6D - Casework Materials - Police Station : Northwest Cabinets - $250,868 7B - Architectural Metal Panels - Police Building : Minnkota - $793,151 7D - EPDM Roofing - Police Station : Roof Tech - $574,460 8D - Sectional Overhead Doors - Police Station :Metro Garage Doors - $114,000 8F - Aluminum Framed Storefronts & Entrances - Police Station : Ford Metro - $774,000 9B - Metal Stud Framing and Gypsum Board Assemblies - Police Station :Mulcahy - $229,950 9D - Painting - Police Station : Steinbrecher - $106,200 9J - Acoustical Ceilings - Police Station :Twin City Acoustics -$197,400 21B - Fire Suppression Systems - Police Station :Frontier - $96,820 22B - Plumbing Systems - Police Station : Peterson Sheet Metal -$433,300 23B - HVAC Systems - Police Station : Thelen Heating -$830,500 22B & 23B - Plumbing & HVAC Systems - Police Station : Klamm Mechanical -$1,535,000 23C - Integrated Automation - Police Station :Tempco -$138,249 26D - Electrical, Communications, Safety & Security - Police Station : CAP Electric -$2,193,000 31B - Earthwork - Police Station : PWS Inc -$443,500 32B - Asphalt Paving - Police Station : MN Roadways -$143,395 32D - Site Concrete - Police Station : McNamara -$146,000 32F - Fences & Gates - Police Station : Action Fence -$298,000 32H - Retaining Walls - Police Station : Hardscape -$89,523 33A - Utilities - Police Station : PWS Inc -$265,500 31B & 33A - Earthwork & Utilities - Police Station :Rachel -$748,900 32B, 33D & 33A - Asphalt, Site Concrete, & Utilities - Police Station :McNamara -$600,000
Award
Fire / Police
$165,637.00
Public - City
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2024
April 22, 2024
6442 140th St W, Apple Valley, MN
Related To This Project
Apple Valley, MN
Bid Date: Mar 08 2024
Apple Valley, MN
Bid Date: Mar 19 2024
Apple Valley, MN
Bid Date: Mar 21 2024
Apple Valley, MN
Bid Date: Mar 20 2024
Apple Valley, MN
Bid Date: Apr 02 2024
Apple Valley, MN
Bid Date: Apr 09 2024
Apple Valley, MN
Bid Date: Apr 26 2024
Apple Valley, MN
Bid Date: Apr 23 2024
Apple Valley, MN
Bid Date: Mar 08 2024
Apple Valley, MN
Bid Date: Mar 08 2024
Apple Valley, MN
Bid Date: Mar 08 2024
Apple Valley, MN
Bid Date: Mar 08 2024
Apple Valley, MN
Bid Date: Mar 06 2024
Apple Valley, MN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.