Renovation of an educational facility in Wilmington, North Carolina. Completed plans call for the renovation of a educational facility.
The following items were discussed: Introductions were made. Ms. Gordon was introduced as the representative from the School District and Mr. Swing was introduced as the Engineer's representative. General: a. Only the written word as contained in the Bid Documents, including any addenda that may be issued, is binding. b. It is the bidder's responsibility to read and review all of the Bid Documents, including addenda. c. Statements made during the Pre-Bid conference are for the sole purpose of calling attention to important information in the Bid Documents. d. Any questions or requests for clarification must be submitted in writing. All responses will be made in the form of addenda to the Bid Documents. Questions must be submitted within seven (7) days of the bid opening BEFORE February 22, 2024. Bids, Bid Bonds and other bidding documents contained within the project documents are to be emailed to stewart.swing@terracon.com Unit Prices and quantities are to be included in the Base Bid. A 5% Bid Bond is required. Complete bids shall consist of bid forms, bid bonds and either MWBE Affidavit A or B. Successful Bidder shall provide Performance and Payment Bonds in the amount of the full contract. General Conditions: a. Contractor must have a General or S Roofing license. b. Contractor shall comply with all applicable codes and permits. c. Contractor to submit to NHC Coast system. d. Contract Time shall be sixty (60) calendar days from date of Notice to Proceed. e. School will be occupied during construction. f. Liquidated damages are set at $500.00 per calendar day for work not accomplished beyond the date of substantial completion and final completion. g. Roofing Guarantee: Manufacturer's Twenty (20) Year Total System Guarantee and a Contractor's Two Year Workmanship Guarantee are required. Notice to Proceed (Contract Admin): May 24, 2023 Notice to Proceed (Constuction on Site): June 13, 2023 Substantial Completion: August 16, 2023 Final Completion: August 23, 2023 Minority Business Guidelines: a. The Owner encouraged that the guidelines be followed and would like the Contractor to make a true effort. Minority Business Participation guidelines are included in the specifications and will need to followed. General Requirements: a. Summary of work and special conditions were discussed. b. Unit Prices and Allowances were discussed. c. Alternates were discussed. Quality Control: a. Fraternatization with students and/or staff is prohibited. b. Contractor's Superintendent must be on site at all times work is being performed. c. Drawings and specifications are required on site at all times. d. Preconstruction Meeting: A preconstruction conference will be scheduled following execution of contracts. Project specifics, questions, and concerns will be discussed at that time. e. Manufacturer's Inspections: Manufacturer must conduct) inspections during the project including a final inspection. f. No roofing work can be subcontracted without prior written consent of the Owner. g. Contractor must have 4 years of contracting experience in the type of work included in this project. Temporary Utilities and Facilities: a. Contractor must provide port-o-johns. Tobacco Products/Firearms: a. Are not allowed at the jobsite at any time. Dumpster/Access/Staging Locations: a. Staging and storage shall be on-site. b. Access to roof will be from the exterior of the building. Protection of Buildings and Property: a. Contractor shall fence off the storage and staging areas. b. Contractor is to access roof from exterior. Document Existing Conditions: a. Contractor must document existing conditions with photos or video. Connects and Disconnects: a. Contractor is to contact Owner prior to disconnecting any cables. Use of Site/Parking/Access/Off Hours: a. Time of work hours will be 7:00am to 5:00pm, Monday through Friday. Any work that will be conducted on the weekend will need to be coordinated with Owner. Asbestos: a. An asbestos survey on the subject roof system was conducted. Asbestos containing materials were not detected in the roof system. Closeout / Project Document Checklist: a. Checklist provided within the project manual. Engineer Reviewed the Technical Documents There being no further questions or comments, the meeting was adjourned and relocated to the roof area. Should anyone know of any errors or omissions within these meeting minutes, please notify the undersigned immediately.
Post-Bid
Educational
$180,000.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 29, 2024
June 13, 2024
204 MacMillan Ave, Wilmington, NC
Related To This Project
Wilmington, NC
Bid Date: Apr 09 2024
Wilmington, NC
Bid Date: Mar 19 2024
Wilmington, NC
--
Wilmington, NC
--
Wilmington, NC
Bid Date: Apr 02 2024
Wilmington, NC
--
Wilmington, NC
--
Wilmington, NC
Bid Date: May 03 2024
Wilmington, NC
Bid Date: Aug 27 2024
Wilmington, NC
Bid Date: Feb 29 2024
Wilmington, NC
Bid Date: Mar 04 2024
Wilmington, NC
Bid Date: Mar 06 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.