Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 20, 2024 at 8:00 PM
Updated March 21, 2024
Demolition, site work and renovation of a water / sewer project in Carleton Place, Ontario. Completed plans call for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
Demolition of existing Findlay Ave. pumping station building and repairs to the existing Princess Street pump station building. Princess Street Sewage Pumping Station Upgrades: The full scope of work is prescribed in detail in the attached tender documents. Without limiting the specifics of these requirements, the work generally consists of: 1 Demolition and disposal of contents of existing pumping station building and selective demolition of the steel wet well along with piping, valves, pumps and hatches. 2 Removal of identified trees to accommodate excavation. 3 Roof, ceiling, and attic insulation replacement for existing pumping station building. 4 Provision of prefabricated FRP wet well insert complete with new pumps, guide rails, platform, ladder, and level monitoring instruments. 5 Provision of new sanitary maintenance hole on incoming sanitary sewer. 6 Provision of concrete buoyancy slab for wet well, concrete buoyancy slab for maintenance hole, and concrete generator and gas meter pads. 7 Provision of new electrical equipment, PLC, ATS, pump starters, and instrumentation to serve the pumping station, housed within the existing pumping station building. 8 Provision of new natural gas driven back-up generator and pressure-treated wooden acoustic barrier. 9 Coordinate, commission, operate, and maintain a temporary bypass pumping system for the duration of the project. 10 Landscaping and application of topsoil and sod to disturbed areas, including around the pumping station building, wet well, new sanitary maintenance hole, and new concrete pads. Findlay Avenue Sewage Pumping Station Upgrades: The full scope of work is prescribed in detail in the attached tender documents. Without limiting the specifics of these requirements, the work generally consists of: 1 Demolition and disposal of the existing pumping station building, equipment, and portion of the steel wet well along with piping, valves, pumps, and hatches.. 2 Supply and install a new enclosure foundation and prefabricated enclosure, complete with electrical equipment, PLC, instruments, and pump starter. 3 Supply and install an exterior natural gas driven generator and prefabricated FRP wet well insert, complete with new pumps, guide rails, platform, ladder, and level monitoring instruments. 4 Provision of concrete buoyancy slab for the wet well, and concrete pad for the new generator and gas meter. 5 Coordinate, commission, operate and maintain a temporary bypass pumping system for the duration of the project. 6 Landscaping and application of topsoil and sod to disturbed areas, including around the pumping station building, wet well, new sanitary maintenance hole, and new concrete pads. 1 Labour and Material Payment Bond in the amount of 100% of the contract value. 2 Performance Bond in the amount of 100% of the contract value. Official bid documents must be obtained from www.merx.com Question Acceptance Deadline: 2024/03/06 04:00:00 PM EST
Post-Bid
Water / Sewer
$1,000,000.00
Public - City
Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 20, 2024
April 17, 2024
Multiple Locations, Carleton Place, ON
Related To This Project
Carleton Place, ON
Bid Date: Apr 18 2024
Carleton Place, ON
Bid Date: Apr 18 2024
Carleton Place, ON
Bid Date: May 23 2024
Carleton Place, ON
Bid Date: Jun 12 2024
Carleton Place, ON
Bid Date: Jun 13 2024
Carleton Place, ON
Bid Date: Jul 09 2024
Carleton Place, ON
Bid Date: Jul 12 2024
Carleton Place, ON
Bid Date: Aug 08 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
