Site work for a playground / park / athletic field in Kearney, Nebraska. Completed plans call for site work for a playground / park / athletic field.

replace the current poured-in-place surface at E.K. and Mary Yanney Heritage Park, 2020 West 11th Street, Kearney, NE 68845. The City of Kearney is an equal opportunity employer and requires all contractors, consultants, etc. to comply with all applicable federal and state laws and regulations. The City of Kearney reserves the right to reject any and all proposals and to accept the proposals it believes is in the best interest of the community. Question Deadline 03/18/2024 at 2:00 PM CT Questions must be submitted to Nate Halliwell, Project Manager nhalliwell@kearneygov.org . Questions submitted after that date will not be considered. The City of Kearney, Nebraska is requesting proposals from qualified playground tile vendors in order to establish a contract to replace the current poured-in-place surface at E.K. and Mary Yanney Heritage Park, 2020 W. 11th Street, Kearney, NE 68845. See site plan proposal attached. The proposal will include material, labor and equipment to remove the current poured-inplace surface and install the new tiled surface and concrete curbing. o The playground area to be replaced is 72' x 40' or 2880 SQFT o A concrete or tile curb can be used at the discretion of each bidder. o Concrete Curbing and Curing: - The concrete mix shall be in accordance with Section 11:20 of the City of Kearney Standard Specifications for Municipal Construction (available under the Public Works Department at www.cityofkearney.org. - The concrete shall be placed, consolidated to fill all voids, struck off to the required grade and floated smooth. After the water sheen has disappeared, the surface should be lightly brushed to a uniform texture. - In order to deter vandalism to the newly poured concrete slab, the Contractor should remain on site until concrete has cured. Contractor shall be responsible for removal, and replacement of concrete if vandalized prior to completion of entire job. - Within 24-48 hours of the concrete slab being poured, all forms shall be pulled and removed from the site. - Within 48-72 hours, the concrete shall be scored. Scoring should correspond to the dimensions of the curbing. o Concrete & Material Clean-up: All excess "cleaned out" concrete shall be removed by the Contractor. All forms of any other materials generated from the construction of the project shall be removed by the Contractor. o Site Restoration: Any areas that have been destroyed, or areas where ruts and depressions have been created, will be restored to the same grade and condition as the surrounding area by the Contractor. The City will be responsible for any necessary irrigation work and re-seeding or sodding. o Underground Utility Locations: Contractor is required to call Digger's Hotline to locate all utilities prior to construction as necessary. o Contractor must provide safety fencing or flagging, minimum four feet (4') high, around the perimeter of the construction area. o Replacement of the playground surfacing must be completed between June 3, 2024 and October 4, 2024. A proposed schedule should be submitted with the proposal. The city will allow for a 30-day construction window to complete the entire scope of work for the project.

Award

Playgrounds / Parks / Athletic Fields

$79,281.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
12
Bidding Soon
113
All Active Projects
52
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

June 3, 2024

img_map_placeholder

2020 W 11th St, Kearney, NE

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.