Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a civil project in Frisco, Texas. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.
Construct approximately 1,090 LF of southbound lanes on Hillcrest Road from 150 feet south of Santiago Road to Aragon Lane and approximately 1,220 LF of southbound lanes from Alviria Drive to 400 feet south of PGA Parkway. Work includes grading, paving, retaining walls, storm drain, inlets, box culvert, headwalls, lighting, pavement markings, signing, irrigation, and landscaping. Questions Due Date: Mar 13th 2024, 5:00 PM CDT General Description / Limits - Construct approximately 1,090 LF of southbound lanes on Hillcrest Road from 150 feet south of Santiago Road and approximately 1,220 LF of southbound lanes from Aragon Lane to 400 feet south of PGA Parkway. b. Scope of Work I. Curbed roadway construction with sidewalks II. Pavement Construction' 9" concrete slab on 12" lime treated subgrade. III. Box Culvert Extension (3-10'x5' CBC) and Retaining Wall, FP grading IV. Storm drain extension with new curb inlets V. Minor water line extension, 1 fire hydrant installation. VI. Street Lighting - median VII. Multi-Conduit System through median for Smart City fiber VIII. Median Landscaping and Irrigation in median IX. Signing and Pavement Marking X. Erosion Control XI. Traffic Control-Generally maintain traffic on existing roadway. XII. Coordination with PGA Pkwy Construction Questions must be received no later than Wednesday, March 13, 2024 @ 5 pm. Questions received after this time will not be answered. Questions must be submitted via the online Bonfire bid posting. Questions asked via email will not receive responses. b. Last addendum will be issued no later than Tuesday, March 19 @ 2 pm. Construct approximately 1,090 LF of southbound lanes on Hillcrest Road from 150 feet south of Santiago Road and approximately 1,220 LF of southbound lanes from Aragon Lane to 400 feet south of PGA Parkway. Work includes, grading, paving, retaining walls, storm drain, inlets, box culvert, headwalls, lighting, pavement markings, signing, irrigation, and landscaping
Bid Results
Roads / Highways
$5,504,378.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2024
May 3, 2024
Hillcrest Rd, Frisco, TX
Related To This Project
Frisco, TX
Bid Date: Mar 21 2024
Frisco, TX
Bid Date: Apr 12 2024
Frisco, TX
--
Frisco, TX
Bid Date: Apr 15 2024
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
--
Frisco, TX
Bid Date: Mar 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.