BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in Frisco, Texas. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Construct approximately 1,090 LF of southbound lanes on Hillcrest Road from 150 feet south of Santiago Road to Aragon Lane and approximately 1,220 LF of southbound lanes from Alviria Drive to 400 feet south of PGA Parkway. Work includes grading, paving, retaining walls, storm drain, inlets, box culvert, headwalls, lighting, pavement markings, signing, irrigation, and landscaping. Questions Due Date: Mar 13th 2024, 5:00 PM CDT General Description / Limits - Construct approximately 1,090 LF of southbound lanes on Hillcrest Road from 150 feet south of Santiago Road and approximately 1,220 LF of southbound lanes from Aragon Lane to 400 feet south of PGA Parkway. b. Scope of Work I. Curbed roadway construction with sidewalks II. Pavement Construction' 9" concrete slab on 12" lime treated subgrade. III. Box Culvert Extension (3-10'x5' CBC) and Retaining Wall, FP grading IV. Storm drain extension with new curb inlets V. Minor water line extension, 1 fire hydrant installation. VI. Street Lighting - median VII. Multi-Conduit System through median for Smart City fiber VIII. Median Landscaping and Irrigation in median IX. Signing and Pavement Marking X. Erosion Control XI. Traffic Control-Generally maintain traffic on existing roadway. XII. Coordination with PGA Pkwy Construction Questions must be received no later than Wednesday, March 13, 2024 @ 5 pm. Questions received after this time will not be answered. Questions must be submitted via the online Bonfire bid posting. Questions asked via email will not receive responses. b. Last addendum will be issued no later than Tuesday, March 19 @ 2 pm. Construct approximately 1,090 LF of southbound lanes on Hillcrest Road from 150 feet south of Santiago Road and approximately 1,220 LF of southbound lanes from Aragon Lane to 400 feet south of PGA Parkway. Work includes, grading, paving, retaining walls, storm drain, inlets, box culvert, headwalls, lighting, pavement markings, signing, irrigation, and landscaping

Bid Results

Roads / Highways

$5,504,378.00

Public - City

Outdoor Lighting, Paving, Site Work

228

19

23

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
79
Bidding Soon
3,545
All Active Projects
1,301
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.