Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 3, 2025 at 8:00 PM
Updated October 22, 2025
Site work for a water / sewer project in Rochelle, Illinois. Completed plans call for site work for a water / sewer project.
The Storm Sewer Will Be Installed From 15th Street South of Squires Landing, East, Within a City Easement, to the Unimproved Right-of-way of N. 14th Street. The Storm Sewer Will Proceed North Along the N. 14th Street Right-of-way and City Owned Parcels to Highland Avenue. The Project Will Continue West, Along Highland Road, to N. 14th. The Project Consists of Installation of Approximately 1400 of 36" Storm Sewer, 125' of 12" Storm Sewer, Saw Cutting, Removal and Replacement of the Existing Sidewalk, Accessibility Ramps, Combination Curb and Gutter, Pavement Removal, Aggregate Base Course, Hma Pavement, Riprap, Necessary or Required Excavation, Granular Backfill or Bedding as Required by the Engineer, and the Grading, Backfilling and Landscaping Necessary to Restore and Leave the Site in a Neat and Orderly Condition, as Well as Other Associated Work Located in the City of Rochelle. Any Objections, Questions or Comments on the City's Specifications Shall Be Submitted in Writing on or Before 1 P.m. October 7, 2025. The Decisions of the City Shall Be Final. The City of Rochelle is an Equal Opportunity Employer. All Contracts for Construction of Public Works Are Subject to the Illinois Prevailing Wage Act (820 Ilcs 130/1-12). A Contract May Be Awarded to the Lowest Responsible Bidder Whose Bid is Found to Be in the Best Interest of the City of Rochelle. The City of Rochelle Reserves the Right to Reject Any and All Bids and to Waive Any Informalities or Irregularities in the Bidding. The City Further Reserves the Right to Review and Study Any and All Bids and to Make a Contract Award Within Forty-five (45) Days After the Bids Have Been Opened. Each Bid Must Be Accompanied by a Bid Bond Payable to the City of Rochelle. The City of Rochelle Will Decide Within 45 Days if It Intends to Proceed With the Project and Award the Contract. The Bid Bond of All Bidders Will Be Retained Until the Agreement Has Been Executed and Approved, After Which All Bid Bonds Will Be Returned. A Certified Cashier's Check May Be Used in Lieu of a Bid Bond. A Performance Surety Will Be Required as Specified in the Contract Documents and Specifications.
Post-Bid
Water / Sewer
$1,740,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2025
December 18, 2025
N 14th St, Rochelle, IL
Related To This Project
Rochelle, IL
--
Rochelle, IL
--
Rochelle, IL
--
Rochelle, IL
--
Rochelle, IL
--
Rochelle, IL
Bid Date: Mar 14 2024
Rochelle, IL
Bid Date: Mar 08 2024
Rochelle, IL
Bid Date: Feb 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
