Renovation of an educational facility in Blacksburg, Virginia. Completed plans call for the renovation of a educational facility.
Interior renovations for the existing Laundry located in the Main Eggleston Hall Dormitory. The project includes selective demolition, plumbing renovations, ventilation system renovations, electrical system renovations, masonry repairs, exterior louvers, metal framed partitions, suspended ceilings, and other finishes. The total project area is approximately 433 GSF. The Deadline for Request for Information (RFI) shall be 12:00PM on Friday, March 8, 2024. The date for Final Completion of the entire project shall be on or before August 7, 2024, as determined by the A/E. Please insure you can achieve Substantial Completion in sufficient time to allow for Final Completion by August 7, 2024. The date for access to the work site is May 13, 2024. The foregoing schedule is predicated on the following constraints: No on-site work shall take place during the week of June 24-June 28, 2024, and the worksite shall be secured during this time. The Owner reserves the right to reject any or all bids. Event Bid description: Hard copy or email proposals will not be accepted. Late proposals will not be accepted, nor will additional time be granted to any individual Vendor. Attachments must be smaller than 50MB in order to be received by the University. A Bid bond is required. Any bid (including the Total Base Bid plus all Additive Bid Items) which exceeds five hundred thousand dollars ($500,000) shall be accompanied by a Commonwealth of Virginia Standard Bid Bond, Form CO-10.2, payable to the Owner as obligee in an amount equal to five percent (5%) of the amount of the bid (the "Bid Bond"). Such Bid Bond shall guarantee the following: that the bidder will not withdraw its bid during the thirty (30) day period following the date of the opening of bids; that if the bid is accepted, the bidder will enter into the Contract with the Owner described in the IFB; that the bidder can and will submit a properly executed and authorized Standard Performance Bond and Standard Labor and Material Payment Bond on the forms included in the IFB. If the bidder withdraws its bid within the thirty (day) period following bid opening, fails to enter into the Contract, or fails to provide the required Standard Performance Bond and Standard Labor and Material Payment Bond within ten (10) days after the bidder's receipt of notice of acceptance of its bid, the bidder and the bidder's surety shall be jointly and severally be liable to the Owner for the difference between the amount specified in the bidder's bid and such larger amount for which the Owner may contract with another party to perform the work covered by said bid, up to the amount of the bid guarantee of 5% of the bidder's total bid amount, as the damage to the Owner resulting from the bidder's default.
Post-Bid
Educational
$200,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2024
April 29, 2024
410 Drillfield Dr, Blacksburg, VA
Related To This Project
Blacksburg, VA
Bid Date: Mar 13 2024
Blacksburg, VA
Bid Date: Mar 08 2024
Blacksburg, VA
Bid Date: Apr 24 2024
Blacksburg, VA
Bid Date: May 09 2024
Blacksburg, VA
--
Blacksburg, VA
Bid Date: Apr 16 2024
Blacksburg, VA
Bid Date: Apr 09 2024
Blacksburg, VA
Bid Date: Apr 29 2024
Blacksburg, VA
Bid Date: Oct 28 2021
Blacksburg, VA
Bid Date: Apr 03 2024
Blacksburg, VA
Bid Date: Jun 18 2024
Blacksburg, VA
--
Blacksburg, VA
Bid Date: Nov 04 2021
Blacksburg, VA
Bid Date: May 11 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.