Site work and new construction of a municipal facility in Fredericksburg, Virginia. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

Questions and Inquiries from Bidders must be received by the Spotsylvania County Procurement Division by Friday, March 15, 2024 at noon. Questions must be emailed to Sylvia Dyson, Sr. Procurement Officer, at SDyson@Spotsylvania.VA.us. The County is not responsible for verbal clarification of information provided by parties other than staff of the Procurement Division. The successful Contractor shall provide one (1) 36 foot by 56 foot, permanently installed new modular building with three (3) private office spaces, two (2) single gang restrooms, one (1) common space area, and one (1) kitchen Area, and one (1) locker room area. Notwithstanding anything to the contrary contained herein, Contractor expressly agrees that A/E/CM has no authority to make any changes in the scope, quantities of work, or to the terms and conditions of the Contract Documents. To the extent the A/E/CM directs the Contractor with regard to any such changes, Contractor assumes sole risk for any costs, expenses and/or damages incurred by Contractor, Owner and any other affected party, for following such direction, unless such direction was approved by County, in writing, in advance of performance of the work associated with the direction by the A/E/CM. Contractor expressly waives any right to claim for additional compensation or additional time for performance of the Work to the extent it fails to comply with the obligations of this Section 2.3. If the Contractor's Proposed Change Order is rejected by the Owner as being within the scope of the Work required by the Contract Documents the Owner may, at its sole option and discretion, direct the Contractor to perform the Work which is the subject of the said Proposed Change Order; the Contractor shall then promptly proceed with said Work. Nothing herein shall excuse the timely performance by the Contractor of the Work because any Proposed Change Order is pending. If notice of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Times) is required by the provisions of any Bond to be given to a surety, the giving of any such notice shall be the responsibility of Contractor and not Owner. The amount of each applicable Bond will be adjusted to reflect the effect of any such change. Each Bid over $100,000 must be accompanied by (1) Letter of Credit; or (2) a Cashier's Check or a Certified Check from the Bidder in an amount not less than five percent (5%) of the Bid, made payable to the County of Spotsylvania; or (3) a Bidder's Bond on the Bid Bond Form provided herein or on a similar form which in every respect materially complies with said Bid Bond Form, in the amount of five percent (5%) of his/her Bid. The successful Bidder shall furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Sum as security for the faithful performance of this Contract, and also a Labor and Material Payment Bond in an amount not less than one hundred percent (100%) of the Contract Sum, as security for the payment of all persons performing labor and furnishing materials under this Contract. The Performance Bond and the Labor and Material Payment Bond shall be in separate instruments acceptable to the County, in accordance with State law and shall be delivered to the County not later than the date of execution of the Contract. The surety shall be such surety company or companies that are acceptable to the County and that are authorized to transact business in the Commonwealth of Virginia. The successful Bidder, upon his/her failure or refusal to execute the Contract within ten (10) days after he/she has received notice of the acceptance of his/her Bid, shall forfeit to the County the security deposited with his/her Bid, as liquidated damages for such failure or refusal. The county expressly reserves the right to reject the Bid of any Bidder if such record discloses that such Bidder, in the opinion of the County, has not properly performed such contracts; or has habitually and without just cause neglected the payment of bills; or has otherwise disregarded his/her obligations to Subcontractors, material men, suppliers or employees; or has had, in the sole and exclusive judgment of County, a poor safety record from prior projects performed within or outside of the County.

Bid Results

Municipal

$215,262.00

Public - County

New Construction, Site Work

10

7

12

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
65
Bidding Soon
1,850
All Active Projects
752
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

April 25, 2024

img_map_placeholder

600 Hudgins Rd, Fredericksburg, VA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.