Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in West Lake Hills, Texas. Working plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
As of April 22, 2024 project was awarded to Packsaddle Management, awarded amount is $1,400,466.49. Lower Camelot Waterline Improvements Description of the Work: Work of the contract is for the construction of the Lower Camelot Waterline Improvements for Travis County WC&ID No 10. The proposed facility will be constructed within Travis County WCID No. 10 boundaries. The project will consist of approximately 3,740-LF of 8-inch pipe with hydrants, air release valves, pressure reducing valve and roadway and drainage improvements along Canyon Rim, Lancelot Way, and Whippoorwill Trail. Installation of approx. 4,100-linear feet of 8-inch waterline including service connections, hydrants, air release valve and paving. The deadline to ask questions is 3/22/2024 12:00 PM CST A. This section describes the Project in general and provides an overview of the extent of the Work to be performed by the CONTRACTOR. Detailed requirements and extent of Work is stated in the applicable Specification Sections and shown on the Drawings. CONTRACTOR shall, except as otherwise specifically stated herein or in any applicable part of these Contract Documents, provide and pay for all labor, materials, equipment, tools, construction equipment, and other facilities and services necessary for proper execution, testing, and completion of the Work. B. Any part or item of the Work which is reasonably implied or normally required to make the installation satisfactorily operable shall be performed by the CONTRACTOR and the expense thereof shall be included in the applicable unit prices or lump sum prices bid for the Work. It is the intent of these Specifications to provide the OWNER with the complete system. All miscellaneous appurtenances and other items of Work that are incidental to meeting the intent of the Specifications shall be considered as having been included in the applicable unit prices or lump sum prices bid for the Work even though these appurtenances and items may not be specifically called for in the Bid Documents. C. The Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of approximately 4,342 linear feet of 12-inch water main and appurtenances. Location of Project A. The Project lies within the City of Austin within Travis County along Canyon Rim Drive, Lancelot Way and Whippoorwill Trail. The project location/route is shown on the Drawings. Anticipated Sequence of Construction 1. Install temporary erosion/sedimentation control measures. 2. Conduct mandatory on-site environmental pre-construction conference. 3. Install tree protection, plan to cut open trenches within the critical root zone of trees and protect foliage from equipment exhaust. 4. Prepare and submit all required project submittals including Trench Safety Plan and preconstruction inspection and video documentation. 5. Prepare temporary material storage and construction staging areas. 6. Install temporary fencing 7. Construct waterline and appurtenances 8. Test new waterline 9. Repair Trench 10. Overlay street 11.Cleanup and restore work site. the Work will be substantially complete within 180-days ; General Conditions within 60 days after the date when the Contract Times commence to run.
Final Planning
Water / Sewer
$200,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2024
April 25, 2024
5324 Bee Cave Rd, West Lake Hills, TX
Related To This Project
West Lake Hills, TX
--
West Lake Hills, TX
Bid Date: May 13 2024
West Lake Hills, TX
Bid Date: Jul 18 2024
West Lake Hills, TX
--
West Lake Hills, TX
Bid Date: Sep 30 2024
West Lake Hills, TX
--
West Lake Hills, TX
--
West Lake Hills, TX
--
West Lake Hills, TX
--
West Lake Hills, TX
--
West Lake Hills, TX
--
West Lake Hills, TX
--
West Lake Hills, TX
--
West Lake Hills, TX
Bid Date: Feb 01 2024
West Lake Hills, TX
Bid Date: Feb 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.