Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a sidewalk / parking lot in San Gabriel, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
**As of April 5, 2024, the project was awarded to the Lowest bidder Vido Samarzich for the amount of $123,880.** Description of Work: The work to be done consists of furnishing all labor, materials, equipment, transportation, and services necessary to complete the removal and replacement of Portland cement concrete (PCC) ADA compliance pedestrian ramps, sidewalks, driveways, curb & gutter, and all other related items as specified on the Plans and Specifications, contract documents and as directed by Project Manager. The Removal and replacement of concrete pedestrian ramps, sidewalk, driveways, and curb & gutter shall be in accordance with the latest edition of the Caltrans Standard Plans and Specifications, Standard Specifications for Public Works Construction, and/or these Technical/Special Provisions. The contract is to be executed within 7 calendar days after award of contract by City Council. Time for completion of the work is thirty (30) working days for all work from the date of the Notice to Proceed. All questions relative to this project prior to the opening of bids shall be in writing or email and received no later than 4:00 p.m. on Wednesday, February 28, 2024, and shall be directed to: Public Works Project Manager, Alan Mai, at email: amai@sgch.org. Project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations (with limited exceptions for this requirement for bid purposes only under Labor Code Section 1771.1a). No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations (DIR). All contractors and subcontractors must furnish electronic certified payroll records to the Labor Commissioner for all new projects awarded on or after April 1, 2015. The Labor Commissioner may excuse contractors and subcontractors on a project that is under the jurisdiction of one of the four legacy DIR-approved labor compliance programs (Caltrans, City of Los Angeles, Los Angeles Unified School District and County of Sacramento) or that is covered by a qualified project labor agreement. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Any contract entered into pursuant to this Notice will incorporate the provisions of the State Labor. Pursuant to the provisions of Section 1773.2 of the Labor Code of the State of California, the minimum prevailing rate of per diem wages for each craft, classification, or type of workman needed to execute the contract shall be those determined by the Director of Industrial Relations of the State of California, which are on file in the Office of the City Clerk, City of San Gabriel and are available to any interested party on request. Attention is directed to the provisions of Sections 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by the Contractor or any subcontractor under them. The Contractor or any subcontractor shall comply with the requirements of said sections in the employment of apprentices. Information relative to apprenticeship standards and administration of the apprenticeship program may be obtained from the Director of Industrial Relations, San Francisco, CA, or the Division of Apprenticeship Standards and its branch offices. Al bidders shal be licensed in accordance with provisions of the Business and Professions Code and shal possess a Class "A" State Contractor's License at the time this contract is awarded. The Successful Contractor and his subcontractors wil be required to possess business licenses from the City of San Gabriel and maintain current until completion of the project. Business licenses can be purchased or renewed at the Finance Department at 425 S Mission Drive, San Gabriel, CA.
Award
Sidewalks / Parking Lot
$123,880.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2024
April 30, 2024
Multiple Locations, San Gabriel, CA
Related To This Project
San Gabriel, CA
Bid Date: May 16 2024
San Gabriel, CA
Bid Date: Jun 26 2024
San Gabriel, CA
--
San Gabriel, CA
--
San Gabriel, CA
Bid Date: Feb 12 2024
San Gabriel, CA
Bid Date: Jan 22 2024
San Gabriel, CA
Bid Date: Jan 03 2024
San Gabriel, CA
--
San Gabriel, CA
--
San Gabriel, CA
Bid Date: Jun 14 2022
San Gabriel, CA
Bid Date: Jun 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.