BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Springfield, Missouri. Working plans call for the construction of a educational facility; and for site work for a educational facility.

As of March 29, 2024, this project has not yet been awarded. The award will be available on April 30, 2024. REQUEST FOR QUALIFICATIONS The Board of Governors for the Missouri State University Missouri State University is accepting qualifications in accordance with RSMo. Sections 67.5050 and 67.5060, for a Construction Manager at Risk (CMAR) team member to provide preconstruction and construction services for the ALUMNI CENTER BUILDING . Missouri State University will be using a two-step CMAR selection process in accordance with RSMo. Sections 67.5050 and 67.5060. The scope of this project is the design and construction of a new Alumni Center Building on the Missouri State University campus. The future location will be near the Davis-Harrington Welcome Center on the northern side of Bear Boulevard within Parking Lot 29. The existing alumni center, Kenneth E. Meyer Alumni Center, is situated in downtown Springfield, at 300 South Jefferson Avenue. The Missouri State University Foundation, set to reside in this new facility, was founded in 1981 in order to fulfill Missouri State University's mission as a comprehensive university in the center of a unique metropolitan region. The Foundation's mission is to unite with passionate supporters and donors of MSU in pursuit of the university's goals and priorities, and to create significant philanthropic resources for the university, its students, faculty, and staff, while serving as a responsible steward of those resources. The inclusion of the new Alumni Center on the main campus, adjacent to the Welcome Center, will not only create a compelling east entrance but also serve as a destination for current and prospective students, faculty, staff, alumni, and visitors to Missouri State University. The Foundation's relocation to the main campus is a significant milestone, establishing a direct connection to campus and the capacity to host various events. The upcoming facility will span approximately 27,000 square feet over two stories, featuring a lobby/reception area, a large banquet hall, an executive board room, enclosed and open office spaces for the 43 employees, multiple conference/meeting rooms of various sizes, ancillary support spaces, and an outdoor event courtyard. There will be significant site, storm water and site utility upgrades including the connection of the building to MSU district chilled water system Last Day for RFQ Questions: March 4, 2024

Final Planning

Educational

$18,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
41
Bidding Soon
659
All Active Projects
286
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 11, 2024

September 28, 2024

March 31, 2026

img_map_placeholder

901 S National Ave, Springfield, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.