Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Toledo, Ohio. Completed plans call for the renovation of a educational facility.
The Project Consists of All Labor, Materials, Equipment, and Services Necessary for the Proper Completion of the Scott Park Campus Roofing Project (Referred to as the "Project"), All in Accordance With the Drawings and Specifications Prepared by the Design Professional. The Work for Which Bids Are Solicited for the Project Must Be Substantially Completed by November 15, 2024, and Finally Complete by November 27, 2024, Unless the Owner Selects the Alternate for an Earlier Completion Date as Provided on the Bid Form. Scott Park Campus Roofing Project $6,985,000 Bid Guaranty: Bidder Shall Furnish a Bid Guaranty, as Prescribed in Sections 153.54, 153.57, and 153.571 of the Ohio Revised Code, in the Form of Either: (1) a Bond for the Full Amount of the Bid in the Form of the Bid Guaranty and Contract Bond Included in the Bid Documents; or (2) a Certified Check, Cashier's Check, or Irrevocable Letter of Credit in an Amount Equal to 10% of the Bid. Bid Amount Shall Be the Total of All Sums Bid, Including All Add Alternatives, but Excluding All Deduct Alternatives. Note: Aia Bid Bond Forms Are Not Acceptable. Contract Bond: the Successful Bidder Who, as a Bid Guaranty, Submits a Certified Check, Cashier's Check, or Irrevocable Letter of Credit in an Amount Equal to 10% of the Bid, Shall Furnish a Contract Bond in the Form Contract Bond Included in the Bid Documents in an Amount Equal to 100% of the Contract Sum. Note: Aia Bond Forms Are Not Acceptable. Liquidated Damages. If the Successful Bidder Does Not Have Its Work Substantially Complete by Its Date for Substantial Completion, the Successful Bidder Shall Pay the Owner and the Owner May Set Off From Amounts Otherwise Due the Successful Bidder Liquidated Damages. The Daily Amounts of Liquidated Damages Are Set Forth in the Table Included in the Owner/contractor Agreement. The Total Amounts of Liquidated Damages Will Be Calculated Based on the Total Number of Calendar Days Beyond the Date for Substantial Completion That the Bidder's Work is Not Substantially Complete. A Successful Bidder Who is Awarded a Contract Shall Be Required to Pay the Specified Wage Rates as Provide in Article 16 Specified Wages for the Work of the General Conditions of the Contract for Construction, Aia Document A201-2007 as Modified and Included in the Bid Documents. The Owner Reserves the Right to Waive Any and All Irregularities Provided That the Defects and Irregularities Do Not Affect the Amount of the Bid in Any Material Respect or Otherwise Give the Bidder a Competitive Advantage.
Bid Results
Educational
$5,697,777.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2024
May 27, 2024
2225 Nebraska Ave, Toledo, OH
Related To This Project
Toledo, OH
Bid Date: Mar 12 2024
Toledo, OH
Bid Date: Mar 06 2024
Toledo, OH
Bid Date: Apr 09 2024
Toledo, OH
Bid Date: Mar 12 2024
Toledo, OH
Bid Date: Mar 20 2024
Toledo, OH
Bid Date: Mar 19 2024
Toledo, OH
Bid Date: Mar 21 2024
Toledo, OH
Bid Date: Mar 26 2024
Toledo, OH
Bid Date: Mar 15 2024
Toledo, OH
Bid Date: Apr 30 2024
Toledo, OH
Bid Date: Mar 19 2024
Toledo, OH
Bid Date: Mar 07 2024
Toledo, OH
Bid Date: Feb 29 2024
Toledo, OH
Bid Date: Mar 07 2024
Toledo, OH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.