BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Toledo, Ohio. Completed plans call for the renovation of a educational facility.

The Project Consists of All Labor, Materials, Equipment, and Services Necessary for the Proper Completion of the Scott Park Campus Roofing Project (Referred to as the "Project"), All in Accordance With the Drawings and Specifications Prepared by the Design Professional. The Work for Which Bids Are Solicited for the Project Must Be Substantially Completed by November 15, 2024, and Finally Complete by November 27, 2024, Unless the Owner Selects the Alternate for an Earlier Completion Date as Provided on the Bid Form. Scott Park Campus Roofing Project $6,985,000 Bid Guaranty: Bidder Shall Furnish a Bid Guaranty, as Prescribed in Sections 153.54, 153.57, and 153.571 of the Ohio Revised Code, in the Form of Either: (1) a Bond for the Full Amount of the Bid in the Form of the Bid Guaranty and Contract Bond Included in the Bid Documents; or (2) a Certified Check, Cashier's Check, or Irrevocable Letter of Credit in an Amount Equal to 10% of the Bid. Bid Amount Shall Be the Total of All Sums Bid, Including All Add Alternatives, but Excluding All Deduct Alternatives. Note: Aia Bid Bond Forms Are Not Acceptable. Contract Bond: the Successful Bidder Who, as a Bid Guaranty, Submits a Certified Check, Cashier's Check, or Irrevocable Letter of Credit in an Amount Equal to 10% of the Bid, Shall Furnish a Contract Bond in the Form Contract Bond Included in the Bid Documents in an Amount Equal to 100% of the Contract Sum. Note: Aia Bond Forms Are Not Acceptable. Liquidated Damages. If the Successful Bidder Does Not Have Its Work Substantially Complete by Its Date for Substantial Completion, the Successful Bidder Shall Pay the Owner and the Owner May Set Off From Amounts Otherwise Due the Successful Bidder Liquidated Damages. The Daily Amounts of Liquidated Damages Are Set Forth in the Table Included in the Owner/contractor Agreement. The Total Amounts of Liquidated Damages Will Be Calculated Based on the Total Number of Calendar Days Beyond the Date for Substantial Completion That the Bidder's Work is Not Substantially Complete. A Successful Bidder Who is Awarded a Contract Shall Be Required to Pay the Specified Wage Rates as Provide in Article 16 Specified Wages for the Work of the General Conditions of the Contract for Construction, Aia Document A201-2007 as Modified and Included in the Bid Documents. The Owner Reserves the Right to Waive Any and All Irregularities Provided That the Defects and Irregularities Do Not Affect the Amount of the Bid in Any Material Respect or Otherwise Give the Bidder a Competitive Advantage.

Bid Results

Educational

$5,697,777.00

Public - City

Renovation

16

12

8

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
74
Bidding Soon
1,316
All Active Projects
596
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2024

May 27, 2024

img_map_placeholder

2225 Nebraska Ave, Toledo, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.