BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Gilbert, Arizona. Completed plans call for the renovation of a water / sewer project.

The City of Mesa is seeking a qualified Construction Manager at Risk (CMAR) to provide Pre-Construction Services and complete Construction Services as the CMAR for the Greenfield Water Reclamation Plant (GWRP) Consolidated Reliability Improvements Construction project. The GWRP Consolidated Reliability Improvements Construction Project is expected to include process improvements, odor control improvements, electrical and control upgrades, generator replacement, and other miscellaneous items as described below. Although listed with six separate project numbers, all work listed will be combined and awarded as one single project. Each project may require its own Guaranteed Maximum Price (GMP). The sections below describe the anticipated scopes for each of these projects. Additional incidental scope may be added through the remainder of the design process. CP0625GN02 - GWRP Power Center No.06 Generator Replacement The scope of this project is: o Replacement of Generator set. o Install a feeder from Power Center 5 (Solids Building) to Power Center 6 (Digestion Facilities). CP0625GN03 - GWRP Reliability and Redundancy Improvements (Headworks Building) The scope of this project is: o Install a new Motor Control Center (MCC) hardware/electronics and components required to be fed off this center. o Install a new RIO Cabinet at new MCC. o Install a new Odor Control Panel. o Install generator hardware/electronics and components at the Automatic Transfer Switches (ATSs) at Power Centers 2, 5A, and 5B. o Convert to open transition configuration as well as replacement of recommended existing PLCs. o Reroute drain line. o Install additional Chemical Pumps for Odor Control. CP897GN05 - GWRP Reclaimed Water System Improvements The scope of this project at the Effluent Pump Station (EPS) is: o Install pressure sustaining valves (PSV). o Install flow meters. o Install isolation valves. o Install and modify discharge headers. o May include modification of existing conditions and/or installation of new overflow basin. CP0897GN26 - GWRP Solids Equipment Replacement The scope of this project: o Replace solids pumps and appurtenances. o Replace 6-inch and 8-inch plug valves. o Replace soft water system. o Replace the boiler hot water tank. o Replace scrubber foul air fans. CP0897GN28 - GWRP Non-Portable Water System Pump Addition The scope of this project: o Install vertical turbine pump and associated piping, electrical and instrumentation. CP0897GN25 - GWRP Aeration Basin Influent Odor Control Improvements The scope of this project: o Install foul air duct piping. o Rehabilitate Odor Control Carbon Towers. o Install Odor Control Scrubber. o Install Scrubber Foul Air Fan. The construction cost is estimated to be but not limited to $14,000,000.00. Questions pertaining to the Construction Manager at Risk selection process or contract issues should be directed to Stephanie Delgado of the Engineering Department at Stephanie.Delgado@MesaAZ.gov.

Post-Bid

Water / Sewer

$14,000,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
14
Bidding Soon
723
All Active Projects
263
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

July 29, 2024

img_map_placeholder

4440 S Greenfield Rd, Gilbert, AZ

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.