BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Los Angeles, California. Completed plans call for the renovation of a educational facility.

The CONTRACTOR shall perform, within the time stipulated in the Contract Documents, all of which are incorporated herein and shall provide all labor, materials, equipment, tools, utility services, transportation and everything else necessary to complete in a workmanlike manner, and in exact compliance with the terms of the Contract Documents, all of the Work required in connection with the following titled Project Flooring Replacement (PSA) Estimate: $3,261,000.00 School /office and Address: Wilson High School, 4500 Multnomah St., Los Angeles, CA 90032 Required CSLB License(S) B General Building, or C-15 Flooring and Floor Covering Bidder must abide by and comply with the OWNER Construction Safety Standards, including prime contractor, subcontractor and/or safety prequalification requirements for bidder and all tiers of its subcontractors, as applicable, before tendering the bid to OWNER. Please e-mail prequalification@laschools.org to request for prequalification questionnaires and requirements. MEP SUBCONTRACTORS Bidders should note that the OWNER's prequalification requirements include mechanical, electrical, and plumbing contractors (i.e., contractors licensed pursuant to Sections 7056-7059 of the Business and Professions Code, specifically holding A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C43, or C-46 licenses pursuant to regulations of the Contractors' State License Board) that contract directly with a bidder to perform any such component work on the Project ("MEP subcontractors"). Bidders that intend to contract with any MEP subcontractors to perform any such component work on the Project shall only select MEP subcontractors that have been prequalified by the OWNER at least five (5) business days before the date fixed for the public opening of bids. CONTRACT ANALYST AND EMAIL ADDRESS: Karmina McCarthy, karmina.mccarthy@lausd.net

Award

Educational

$4,393,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

63

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
105
Bidding Soon
2,244
All Active Projects
997
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

May 20, 2024

img_map_placeholder

4500 Multnomah St, Los Angeles, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.