Site work and new construction of an educational facility in Springfield, Missouri. Working plans call for the construction of a educational facility; and for site work for a educational facility.
As of August 27, 2024, a design team and general contractor have been selected. The name of the alumni center will now be called the Clifton M. Smart III University Advancement Center. Missouri State University (Owner) is accepting qualifications for a Construction Manager at Risk (CMAR) team member to provide preconstruction and construction services for the Alumni Center Building project on the Springfield campus. The Owner will be using a two-step CMAR selection process in accordance with RSMo. Sections 67.5050 and 67.5060. The overall budget for the project is anticipated to be $18,000,000 based on a combination of private donations and University funding. The budget will include all fees, construction costs, owner costs, and any other costs associated with the project. The scope of this project is the design and construction of a new Alumni Center Building on the Missouri State University campus. The future location will be near the Davis-Harrington Welcome Center on the northern side of Bear Boulevard within Parking Lot 29. The existing alumni center, Kenneth E. Meyer Alumni Center, is situated in downtown Springfield, at 300 South Jefferson Avenue. The Missouri State University Foundation, set to reside in this new facility, was founded in 1981 in order to fulfill Missouri State University's mission as a comprehensive university in the center of a unique metropolitan region. The Foundation's mission is to unite with passionate supporters and donors of MSU in pursuit of the university's goals and priorities, and to create significant philanthropic resources for the university, its students, faculty, and staff, while serving as a responsible steward of those resources. The inclusion of the new Alumni Center on the main campus, adjacent to the Welcome Center, will not only create a compelling east entrance but also serve as a destination for current and prospective students, faculty, staff, alumni, and visitors to Missouri State University. The Foundation's relocation to the main campus is a significant milestone, establishing a direct connection to campus and the capacity to host various events. The upcoming facility will span approximately 27,000 square feet over two stories, featuring a lobby/reception area, a large banquet hall, an executive board room, enclosed and open office spaces for the 43 employees, multiple conference/meeting rooms of various sizes, ancillary support spaces, and an outdoor event courtyard. There will be significant site, storm water and site utility upgrades including the connection of the building to MSU district chilled water system. The scope of services required by the selected firm shall be as follows: 1. Estimating and budget analysis services throughout the design phases based on regular participation in design meetings with the owner, consultants, and from thorough review of consultant drawings and specifications. This shall include development of an estimated Guaranteed Maximum Price (GMP) at the end of the Design Development and a final GMP after the Construction Document phase of the project. 2. Provide an accurate, regularly updated, viable construction schedule throughout design and construction phases. 3. Public solicitation and public opening of subcontractor bids, analysis of bids received and recommendations for award of work. Missouri State University reserves the right to approve all sub-contractors. 4. The CMAR will be required to obtain bids and/or quantify costs for all work so that the GMP amendment may be executed within a month after completion of the Construction Document phase. 5. Provide complete and comprehensive construction phase oversight and administration in coordination with the Consultant's construction administration services. The CMAR's services shall include providing the appropriate full-time, on-site project supervision, project management, safety program, a quality assurance/quality control (CQCP) plan, submittal review and coordination, shop drawing review and coordination, change order preparation, pay request processing, conducting OAC meetings, an internal pre-punch list process and project close-out documentation. The CMAR will provide collaborative project management software for use in organizing documents, coordinating, and communicating with subcontractors, owner and consultants. 6. Schedule, conduct, and preside over meetings to discuss construction procedures, progress, and scheduling with Owner, each Contractor, and the Consultant(s). Construction Manager shall prepare agendas, meeting minutes, and an updated construction schedule promptly distribute such to the Owner, Consultant, and all meeting participants. 7. Coordinate and discuss all contractor change requests for changes in scope and provide recommendations to the Owner concerning the acceptance of change requests to be processed in a change order. Negotiate pricing with contractors, prepare documentation required, and revise project budget and/or schedule to reflect approved change orders. 8. Construction Manager shall oversee all safety related activities including but not limited to, conducting safety meetings, performing work site safety assessment inspections, recordkeeping, and pre-construction safety audits. 9. Recommendations for materials, equipment, potential construction schedule impacts and construction feasibility throughout the design phases.
Pre-Construction/Negotiated
Educational
$18,000,000.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2024
February 11, 2025
901 S National Ave, Springfield, MO
Related To This Project
Springfield, MO
Bid Date: Mar 26 2024
Springfield, MO
Bid Date: Mar 28 2024
Springfield, MO
Bid Date: Mar 14 2024
Springfield, MO
Bid Date: Mar 11 2024
Springfield, MO
Bid Date: Mar 06 2024
Springfield, MO
Bid Date: Mar 07 2024
Springfield, MO
Bid Date: Mar 08 2024
Springfield, MO
Bid Date: Mar 27 2024
Springfield, MO
Bid Date: Mar 11 2024
Springfield, MO
Bid Date: Mar 05 2024
Springfield, MO
Bid Date: Mar 21 2024
Springfield, MO
Bid Date: Mar 05 2024
Springfield, MO
Bid Date: Mar 22 2024
Springfield, MO
Bid Date: Feb 22 2024
Springfield, MO
Bid Date: Feb 20 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.