BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 30, 2024 at 8:00 PM

Updated March 31, 2024

Site work, new construction and renovation of a mixed-use development in South Salt Lake, Utah. Completed plans call for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; fitness / recreation center; fitness / recreation center; and fitness / recreation center.

Pre-Bid Meeting: See the project manual. Failure to attend a mandatory pre-bid conference or site visit shall result in the disqualification of any bidder that does not have an authorized representative attend the entire duration of the mandatory prebid conference. Contractors will be considered late and will not be allowed to attend the meeting if they arrive after the attendance roll has been signed by all in attendance and the doors to the room are closed. Nothing stated at this meeting will change this Invitation For Bid unless a change is made by written addendum and posted on the Utah Public Procurement Place. A bid that is not responsive includes a bid that: 1. is conditional; 2. attempts to modify the bid requirements; 3. contains additional terms or conditions; or 4. fails to conform with the requirements or specifications of the invitation for bids. A bid that is submitted by a bidder who is not responsible includes a bid where Granite School District concludes that the bidder or an employee, agent, or subcontractor of the bidder, at any tier, is unable to satisfactorily fulfill the bid requirements. Granite School District trash cans and dumpsters may not be used by the contractor or by sub-contractors without specific permission by Granite School District. Any necessary grading, if any is associated with this bid, must be done with equipment that is GPS equipped. o Start date was changed to May 20, 2024 o Completion date was changed to August 5, 2024 o All line to be 2" wide. o 12-month screen and recoat to include 2 topcoats of Basic Coating StreetShoe OPT. o Install solid step blocking under bleacher wheel locations. o Change requirement from ProAction Thrust to Action Thrust I. o All attendees were provided with floor layout. o Center logo, lettering, and key area to be vinyl. o 8" thresholds. o Add 4 new volleyball sleeves and covers.

Award

Educational

$155,206.00

Public - City

New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
66
Bidding Soon
1,042
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2024

May 20, 2024

Project location map

3031 S 200 E, South Salt Lake, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.