BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of a mixed-use development in South Salt Lake, Utah. Completed plans call for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; fitness / recreation center; fitness / recreation center; and fitness / recreation center.

Pre-Bid Meeting: See the project manual. Failure to attend a mandatory pre-bid conference or site visit shall result in the disqualification of any bidder that does not have an authorized representative attend the entire duration of the mandatory prebid conference. Contractors will be considered late and will not be allowed to attend the meeting if they arrive after the attendance roll has been signed by all in attendance and the doors to the room are closed. Nothing stated at this meeting will change this Invitation For Bid unless a change is made by written addendum and posted on the Utah Public Procurement Place. A bid that is not responsive includes a bid that: 1. is conditional; 2. attempts to modify the bid requirements; 3. contains additional terms or conditions; or 4. fails to conform with the requirements or specifications of the invitation for bids. A bid that is submitted by a bidder who is not responsible includes a bid where Granite School District concludes that the bidder or an employee, agent, or subcontractor of the bidder, at any tier, is unable to satisfactorily fulfill the bid requirements. Granite School District trash cans and dumpsters may not be used by the contractor or by sub-contractors without specific permission by Granite School District. Any necessary grading, if any is associated with this bid, must be done with equipment that is GPS equipped. o Start date was changed to May 20, 2024 o Completion date was changed to August 5, 2024 o All line to be 2" wide. o 12-month screen and recoat to include 2 topcoats of Basic Coating StreetShoe OPT. o Install solid step blocking under bleacher wheel locations. o Change requirement from ProAction Thrust to Action Thrust I. o All attendees were provided with floor layout. o Center logo, lettering, and key area to be vinyl. o 8" thresholds. o Add 4 new volleyball sleeves and covers.

Award

Educational

$155,206.00

Public - City

New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
72
Bidding Soon
1,019
All Active Projects
407
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 18, 2024

May 20, 2024

August 5, 2024

img_map_placeholder

3031 S 200 E, South Salt Lake, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.