BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Erwin, North Carolina. Completed plans call for the renovation of a transportation facility.

**As of May 3,2024 project was awarded but awarded amount is not available.** The County of Harnett reserves the right to reject any and/or all proposals received, or to select the proposal which, in our opinion, is in the best overall interest of the County. Inquiries and requests for clarifications should be submitted to Ira Hall, CIO or via email ihall@harnett.org within one (1) week following receipt of these specifications Evaluate the current systems in place and determine the ideal option that would provide the best security system at the most reasonable cost. The Contractor shall design, test, deliver, furnish, install and warrant all new systems for the Harnett County Jetport Terminal. All systems should have the following: 1. The system should have the ability to expand as the facilities grow. 2. The system should be accessible remotely via wireless or broadband systems. 3. The system should encompass the ability to: a. Identify visitors and staff that enter the location. b. Alert key County personnel if something abnormal is occurring. c. Have appropriate CCTV cameras to provide a visual record of activities at key areas and record the visual record for up to 30 days and stored off site as directed by the Harnett County Information Technology Director or designee. d. Provide CCTV recording of control access points to the terminal and runway, including doors and gates and any other means of ingress or egress. 4. The minimum options of the system should include: a. Access Control to all doors and gates that will be recorded and stored for determination of access b. CCTV cameras in critical defined areas by Harnett County Jetport and Information Technology staff. c. The ability to alert Harnett County key personnel. d. Systems analysis to identify potential equipment failures. e. Online support to assist in solving or diagnosing problems or assistance in system operation. f. Twenty-four (24) hour emergency service availability. g. Provide an electronic operations and maintenance manual to the Information Technology Director or designee

Award

Transportation Terminals

$350,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
74
Bidding Soon
1,238
All Active Projects
489
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

March 27, 2024

img_map_placeholder

615 Airport Rd, Erwin, NC

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.