BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Pembroke Pines, Florida. Completed plans call for the renovation of a educational facility.

Storefront Replacements at Various Charter Schools The City Commission of the City of Pembroke Pines reserves the right to reject any and all proposals; to waive any and all informalities or irregularities, and to reject all or any part of any proposal as they may deem to be in the best interest of the citizens of the City of Pembroke Pines. Contractor to remove existing storefront systems and dispose of at the City's discretion. o Contractor shall be responsible to remove all debris from the site daily. o Contractor is responsible for removal of metal framing wall at Academic Village and Central Campus main entries. o The contractor must be careful to maintain security alarms, and other existing conditions for all parts of items to remain. Contractor shall take proper care to protect and close off work area as required for normal facility operation. o Doors WE1, WE2, WE3, AV2, and AV3 are to include Allegion LCN 4040XP closers, Von Duprin 98/99 Series concealed vertical rods with push bar, hinges, power supply, Von Duprin EPT10 power transfer, Schlage AD Series card reader, and keyway cylinder Schlage Everest T for all doors. Any wiring needed for these items is to be included. o Doors WE1, WE2, and WE3 require remote openers compatible with hardware being installed. o Doors AV1, AV4 and C1 will not require card reader, push bars, EPT10 power transfer, power supply, and closer hardware. o Contractor shall provide key cylinders a minimum of 2 weeks in advance for owner to rekey prior to Contractor's installation. o Frame color to match existing. o All doors removed shall have the new assemblies installed before end of work day to ensure that building can be locked up. o Any repairs required around the doors due to replacement of such, shall be done by the contractor to include but not limited to, removal and reinstall drywall, stucco, paint, polyurethane sealant, interior and exterior floors, etc. o Contractor is responsible for acquiring permit and calling in all necessary inspection Central Campus 12350 Sheridan St,Pembroke Pines, FL 33026 Academic Village 17189 Sheridan St,Pembroke Pines, FL33331 West Elementary 18501 Pembroke Rd, Pembroke Pines, FL 33029

Award

Educational

$155,936.00

Public - City

Renovation

12

6

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
251
Active Projects
130
Bidding Soon
1,769
All Active Projects
746
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 26, 2024

May 1, 2024

September 28, 2024

img_map_placeholder

Multiple Locations, Pembroke Pines, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.