Published July 18, 2025 at 8:00 PM

Updated July 19, 2025

Site work for a water / sewer project in Alameda, California. Completed plans call for site work for a water / sewer project.

As of July 18, 2025, this project has been awarded. Closed solicitation has been included below for reference. ............ The City of Alameda is soliciting proposals from qualified service providers to design and permit the abandonment of three underground service tanks (UST) and their replacement with aboveground service tanks (AST) at the City's Maintenance Service Center (MSC), and the excavation and replacement of a single UST at the Alameda Police Station. The City's fueling station at the MSC is currently served by three single-wall, fiberglass USTs (one 6,000-gallon gasoline tank and two 1,000-gallon diesel fuel tanks). In order to comply with state and federal regulations, all three tanks must be closed in accordance with Alameda County Department of Environmental Health (ACDEH) requirements and associated State and Federal regulations. The City's intent is to pursue approval to abandon these tanks in-place and install new AST's and associated fueling equipment to meet current and future fueling needs and regulatory requirements. The City's Police Department currently has one diesel-fueled standby/backup generator that is served by a 6,000 gallon, single-wall, fiberglass UST. In order to comply with state and federal regulations, this tank must be closed in accordance with ACDEH requirements and associated state and federal regulations. The City's intent is to remove this tank and replace it with a new double-wall, compliant UST with a capacity of 6,000 gallons. Proposers shall read the information contained in this Request for Proposal (RFP) to understand how to submit the proposal, what documents must accompany the proposal and what legal obligations apply when the Proposer submits a proposal. Any Proposer that wishes to be considered for this work must submit the information requested in this RFP and if invited, participate in an evaluation interview panel. Deadline to submit questions: 3/04/2024 QUESTIONS Proposers are solely responsible for determining if any addenda have been issued. Addenda will be published on this same website. Please direct any Project questions to Zach Petit. Questions must be by written email to zpetit@alamedaca.gov and received by March 4, 2024. SCOPE OF SERVICES The scope of services to be covered by this RFP include the following work for the closure of all existing USTs at both locations: identify all regulatory requirements for this work, provide engineering and design services, perform any necessary soil and water sampling/profiling, securing required permits, and any other associated work needed to complete tank closures. The scope also includes providing engineering and design services to deliver a complete drawings and specification package for the installation of new ASTs (at MSC) and the new UST (at APD). Specific details for each location are as follows: Maintenance Service Center (MSC): The existing USTs are located under a steel-framed canopy that covers the fueling facility. It is the City's intent to leave this structure in place and request approval from ACDEH to allow for the existing USTs to be abandoned in place. The City has confirmed with ACDEH that they will consider this request with the submission of the required "UST Closure Plan". There is an existing automated vehicle wash bay immediately adjacent to the fueling facility. It is the City's intent to remove the vehicle wash equipment and utilize this space for the installation of new ASTs (number and capacity to be determined).

Award

Water / Sewer

$1,495,000.00

Public - City

Site Work

12

5

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
84
Bidding Soon
1,946
All Active Projects
744
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2025

img_map_placeholder

1555 Oak St, Alameda, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.