BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2024 at 8:00 PM

Updated March 15, 2024

Site work for a transportation facility in Boston, Massachusetts. Completed plans call for site work for a transportation facility.

Work Will Include Replacement of Ties, Rail, Restrained Rail Along Both Tangent, Curved and Restrained Curve Track, Removal and Replacement of Broken or Lock Spike Plates With Pandrol Plates, Insulators and C-bonds (Where Called For or Where Damaged by Contractor), Contact Rail Replacement, Ballast Replacement (Full Depth and Spot), Joint Elimination-thermite Welding, Direct Fixation and Floating Slab Repairs Including Concrete Repairs and Replacement, Surface Line and Tamping and Track Stabilizing Where Directed. Cwr Will Require Thermite Welding and Destressing in Accordance With Mbta Standards. Work Will Include Concrete Work to Replace Primary and Secondar Direct Fixation Slabs. Work May Require Early Action Items Like Weekly Meetings With Mbta to Plan and Schedule Work, Pre Plating Ties, Site Walks to Finalize Work Limits, Materials Delivery, Materials Staging, Equipment Movement, Schedule Update, Etc. Contractor Will Be Required to Remove All Surplus Materials Generated by the Project and All Existing Currently Within The Project Limits. Bidders' Attention is Directed to Appendix 1, Notice of Requirement for Affirmative Action to Insure Equal Employment Opportunity; and to Appendix 2, Supplemental Equal Employment Opportunity, Anti-discrimination, and Affirmative Action Program in the Specifications. In Addition, Pursuant to the Requirements of Appendix 3, Disadvantaged Business Enterprise (Dbe) Participation Provision, Bidders Must Submit an Assurance With Their Bids That They Will Make Sufficient and Reasonable Efforts to Meet the Stated Dbe Goal of 5% Percent. Microsoft Teams Need help Join the meeting now Meeting ID: 298 828 959 375 Passcode: V667cb Electronic bids for MBTA Contract No. T35CN01-, Supplemental Track Improvement Program Contract 1- Green, Blue, and Orange Line, Systemwide, PROJECT VALUE - $10,000,000 (CLASS 1-GENERAL TRANSIT AND ten oclock (10:00 a.m.) on March 14th, 2024. Immediately thereafter, in a designated room, the Bids will be opened and read publicly

Post-Bid

Transportation Terminals

$10,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

19

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
530
Active Projects
244
Bidding Soon
3,641
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

May 13, 2024

Project location map

Multiple Locations, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.