BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Mount Pleasant, Michigan. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000344133 The City of Mount Pleasant is requesting the submission of proposals to provide professional surveying, design engineering and landscaping design services for the development of the Mid-Michigan / GKB Pathway North Connection located between the existing GKB Trail at Broadway Street and Mission Creek Park within the City of Mount Pleasant and Charter Township of Union, Isabella County, MI The Mid-Michigan / GKB Pathway North Connection proposes an approximately 1.25 mile-long, 10-foot-wide bituminous non-motorized trail with 2-feet of gravel shoulder clear space along either edge. The trail will connect Mission Creek Park to the north and Nelson Park to the south. The conceptual design for the Mid-Michigan / GKB Pathway North Connection was completed in 2022. The trail will utilize public property in the form of road rights-of-way, requiring a limited number of easements on private property to allow construction as shown. Letters of easements commitments for all required locations have been secured by the City of Mount Pleasant. When complete, this trail will represent a segment in the Mid-Michigan Pathway, the master plan for which connects to the Pere Marquette Trail to the north and the Fred Meijer Trail to the south, providing the opportunity for regional non-motorized transportation and recreation. Question Deadline 03/12/2024 Questions are submitted online No, Any questions relative to the scope of services must be submitted by e-mail to pbiscorner@mt-pleasant.org Construction Start Date: 03/03/2025 Construction End Date: 12/05/2025 The City reserves the right to accept or reject any and all proposals, to re-solicit proposals, to waive any irregularities, to negotiate pricing, and to select the proposal deemed to be in the best interest of the City.

Conceptual

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
51
Bidding Soon
670
All Active Projects
281
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

img_map_placeholder

Multiple Locations, Mount Pleasant, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.