BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Salisbury, Maryland. Completed plans call for site work for a water / sewer project.

Last Day for Questions: 03/18/2024 @ 12:00 p.m Questions regarding Bid documents or procedures should be referred to Michael Lowe, Senior Buyer, during normal business hours, at 410-548-3192, or via email at mlowe@salisbury.md. The purpose of this project is to provide flow meters on the existing wells (Well #1 and #2) for the Paleo Water Treatment Plant. Well #1 is located to the west of the Henry S. Parker Athletic Complex in the woods. Well #2 is located in Henry S. Parker Athletic Complex. The venturi meter vault is located at the Paleo Water Treatment Plant on Scenic Drive. The proposed meter vaults at Well #1 and Well #2 shall intercept the existing raw water mains. The vaults shall be precast concrete as noted in the project plans. System integration is not a part of the project scope; however, signal wires and hardware shall be terminated. A. Well #1 Flow Meter: 1. Test pit existing water main outside of the fencing. 2. Coordinate shutdown of the well and remove existing water main in the vicinity of the proposed meter vault and valving. 3. Install two (2) gate valves, install water main, install vault. 4. Install flow meter and meter vault appurtenances. 5. Run signal wire and 120 volt wiring from the well and to the vault. 6. Install sump pump, piping, and dry well. 7. Paint piping inside of the vault. 8. Perform start-up and calibration of the flow meter. B. Well #2 Flow Meter: 1. Test pit existing water main inside of the fencing. 2. Coordinate shutdown of the well and remove existing water main in the vicinity of the proposed meter vault and valving. 3. Install two (2) gate valves, install water main, install vault. 4. Install flow meter and meter vault appurtenances. 5. Run signal wire and 120 volt wiring from the well and to the vault. 6. Install sump pump, piping, and connect to existing drain. 7. Paint piping inside of the vault. 8. Perform start-up and calibration of the flow meter. C. Existing Venturi Vault: 1. Test pit Coordinate shutdown of the wells. 2. Remove existing venturi meter and appurtenances noted in the project plans. 3. Install spool piece and flange or coupling. 4. Modify pipe support. 5. Paint piping inside the vault. Work shall be completed within 120 days of Notice to Proceed.

Award

Water / Sewer

$338,850.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
45
Bidding Soon
808
All Active Projects
348
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

June 3, 2024

img_map_placeholder

Multiple Locations, Salisbury, MD

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.