Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and addition to a municipal facility in Sinton, Texas. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; and for site work for a municipal facility.
As of May 10, 2024, this project has not yet been awarded. The project is expected to be awarded on May 20, 2024. The Nueces River Authority, Uvalde, Texas, via a contract for project administration and management with the San Patricio County Drainage District, is seeking to hire a Contractor to design and build a steel structured building to house additional office space. The successful respondent will contract with the District as the Design Build Contractor (DBC). The DBC will be responsible for compliance with all requirements of the City of Sinton, Texas building codes, and any requirements specified by San Patricio County. The DBC will also be responsible for foundation and structural design to conform with any requirements for governmental buildings constructed along the Gulf Coast of Texas, and any added requirements due to soil conditions for the proposed slab, etc. The goal of the project will be to provide additional office space to include a kitchen, break room, HAVC closet, kitchen closet, 2 men's restrooms, one women's restroom, telecom closet, conference room and closet. The building is to be placed in the area behind the existing General Offices of the San Patricio County Drainage District located at 701 S. San Patricio Steet, Sinton, Texas 78387. Deadline for submission of questions March 20, 2024 @ 5:00 PM, CST The Authority reserves the right to verify citizenship or right to work in the United States. DBC must not commence work under this agreement until all required insurance has been obtained and such insurance has been approved by the Authority. DBC must not allow any subcontractor to commence work until all similar insurance required of any subcontractor has been obtained. B. DBC must furnish to the Executive Director with the signed agreement a copy of certificates of Insurance (COI) with applicable policy endorsements showing the following minimum coverage by an insurance company(s) acceptable to the Executive Director. The District and Authority must be listed as an additional insures on the General liability and Auto Liability policies, and a waiver of subrogation is required on all applicable policies. Endorsements must be provided with COI. Project name and or number must be listed in Description Box of COI. BACKGROUND: The Nueces River Authority, Uvalde, Texas herein after "Authority", via a contract for project administration and management with the District, is seeking to hire a Contractor to design and build a steel structured building to house additional office space as demonstrated in the conceptual drawing attached as Exhibit D. 1. PROJECT SCOPE: The successful respondent will contract with the District as the DBC. The DBC will be responsible for compliance with all requirements of the City of Sinton, Texas building codes, and any requirements specified by San Patricio County. The DBC will also be responsible for foundation and structural design to conform with any requirements for governmental buildings constructed along the Gulf Coast of Texas, and any added requirements due to soil conditions for the proposed slab, etc. The goal of the project will be to provide additional office space to include a kitchen, break room, HAVC closet, kitchen closet, 2 men's restrooms, one women's restroom, telecom closet, conference room and closet. 2. The building is to be placed in the area behind the existing General Offices of the San Patricio County Drainage District located at 701 S. San Patricio Steet, Sinton, Texas 78387. 3. The DBC is to meet with the Authority to fully understand the scope and expectations of the project and review requirements in regard to fixtures, finishes, environmental and sustainability requirements, design schedule, modifications during design, submittals during design, areas available for use by the DBC, access requirements, and Project Schedule. 4. DBC shall provide Architectural, Civil, Electrical Mechanical, Plumbing, Design Drawings sealed by the appropriate licenses professional (Architect/Engineer) at 90% and 100% for review and approval. Slab design shall be by an Engineer licensed and registered in the State of Texas. 5. After 100% construction documents are approved, the Authority will arrange an on-site preconstruction meeting with the DBC. The agenda will include as a minimum, correspondence procedures, jobsite safety, roles and responsibilities, lines of authority, progress payments, submittal process, resolution to comments, construction schedule, modifications, weekend, holidays, night work, and applicable traffic control. 6. Construction documents shall be prepared in accordance with the City of Sinton Building Code. 7. The identification of the required permits for this project is the responsibility of the DBC. 8. The following deliverables are required, design development drawings, construction specifications, basis for slab design and slab design calculations. 9. The following are general construction requirements: a. Site Disturbance: Minimize the construction limits of the project to reduce the project's impact on the site. b. Toxic Chemicals: Do not allow toxic chemicals to enter sewers or storm drains or contaminate land or any body of water.
Post-Bid
Municipal
$700,000.00
Public - County
Addition, Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2024
August 5, 2024
701 S San Patricio St, Sinton, TX
Related To This Project
Sinton, TX
Bid Date: Apr 04 2024
Sinton, TX
Bid Date: May 10 2024
Sinton, TX
--
Sinton, TX
--
Sinton, TX
Bid Date: Jun 20 2024
Sinton, TX
--
Sinton, TX
Bid Date: Aug 08 2024
Sinton, TX
--
Sinton, TX
Bid Date: Dec 14 2023
Sinton, TX
Bid Date: Aug 31 2022
Sinton, TX
Bid Date: Mar 22 2022
Sinton, TX
Bid Date: Mar 04 2022
Sinton, TX
--
Sinton, TX
Bid Date: Mar 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.