BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2024 at 8:00 PM

Updated June 28, 2024

Site work for a road / highway in Lloydminster, Saskatchewan. Completed plans call for site work for a road / highway.

The rehabilitation of 40 Avenue between 52 Street and 57 Street through the completion of either miscellaneous roadway patching and repairs, levelling course as directed by the Engineer, asphalt concrete pavement overlays, or roadway base repair (full depth reclamation) with foamed asphalt and asphalt concrete pavement resurfacing. The Work includes the following quantities: 7,880m2 of full depth reclamation using foamed asphalt or cement and the subsequent asphalt concrete pavement resurfacing using the City of Lloydminster Modified H2 hot-mix asphalt concrete pavement with a compacted thickness of 160mm. Granular base course approach tie-in placement. Painted and Hot Thermoplastic pavement markings. Traffic Accommodation and Advanced Warning Signage associated with a complete road closure. The rehabilitation of 40 Avenue will be split into two (2) separate scopes of work as follows: 40 Avenue between 52 Street and the Canadian Pacific (CP) Railway Tracks - roadway patching and overlay. 40 Avenue between the Canadian Pacific (CP) Railway Tracks and 57 Street - full depth reclamation using foamed asphalt and overlay. Documents can be obtained from https://lloydminster.bidsandtenders.ca/ Question Deadline 03/06/2024 at 5:00 PM CT

Award

Roads / Highways

$989,560.00

Public - City

Site Work

7

19

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
55
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2024

May 1, 2024

Project location map

40 Ave, Lloydminster, SK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.