BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Inglewood, Ontario. Completed plans call for site work for a water / sewer project.

Prequalification No: 2023-590PQ, 2023-591PQ, 2024-245PQ. Tender for the construction of a two-cell 40ML drinking water reservoir with Reservoir Distribution Centre (RDC). The reservoir will be situated atop a compacted soil fill pile, which was constructed under a previous project. The foundation design includes a significant number of deep caissons exceeding 20m in depth from the top elevation of the existing fill pile. The General Contractor will be required to construct the reservoir, RDC, and complete all related works as will be detailed in the Tender documents. Aspects of the scope of the Project include but are not limited to: - Site mobilization and preparation, including environmental controls. - CPP Feedermain construction to the extents of this Project as indicated on the Contract Drawings. A separate contract will be concurrently constructed and will ultimately connect to these feedermains. - A reservoir distribution center valve chamber containing large diameter piping, flow measurement, valving, operator area, electrical room, and access house for entry into the reservoir. - Site civil works including yard piping, road construction, site drainage re-scaping, landscaping, stormwater management upgrades. - Standby power equipment. - Associated electrical, instrumentation and controls. - Incorporation of the operation of the Victoria Reservoir into the Region's SCADA system. - Construction of a snow storage area Documents can be obtained at: https://peelregion.bidsandtenders.ca Question Deadline: Wed Jan 8, 2025 12:00:00 PM (EST)

GC Bidding

Water / Sewer

$27,000,000.00

Public - County

Site Work

142

18

8

2

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer?s Field Services, Temporary Facilities and Controls, Construction Facilities, First Aid Facilities, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Protecting Installed Construction, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Metal Fastenings, Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Floor Plates, Metal Stair Treads and Nosings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Gypsum Sheathing, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Sheet Waterproofing, Thermal Protection, Thermal Insulation, Air Barriers, Roofing and Siding Panels, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Plastic Doors, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Curtain Wall and Glazed Assemblies, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units, Healthcare Equipment, Examination and Treatment Equipment, Treatment Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating, Chairs, Multiple Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Facility Potable-Water Storage Tanks, Plumbing Fixtures, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities, Processed Water Piping for Laboratory and Healthcare Facilities
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Humidity Control Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Operation and Maintenance of Electrical Systems, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Shoring and Underpinning, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Caissons, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Fuel Distribution Utilities, Natural-Gas Distribution, Electrical Utilities, Utility Substations, Communications Utilities, Communications Structures, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition, Airfield Signaling and Control Equipment, Transportation Construction and Equipment, Roadway Construction
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction, Operation and Maintenance of Waterway and Marine Construction, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Bridge Cranes, Hoists, Lifting Devices, Clamps, Hooks, Slings, Manufacturing Equipment, Assembly and Testing Equipment, Applicators, Cutting Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
119
Bidding Soon
2,557
All Active Projects
1,001
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

March 17, 2025

img_map_placeholder

3121 King St, Inglewood, ON

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construction of the Victoria Reservoir

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.