BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2024 at 8:00 PM

Updated March 15, 2024

Site work for a bridge / tunnel in Woodmohr, Wisconsin. Completed plans call for site work for a bridge / tunnel.

The culverts will be supplied by the Town of Woodmohr. This bid will be for the installation of the culvert only. Culverts will be placed at a depth and slope for proper water flow. Proper fill will be placed and compacted every 6 inches. Eight inches of 1 1/4 dense graded base coarse The Town Board reserves the right to reject any or all bids and accept bid most advantageous to the town.

Post-Bid

Bridges / Tunnels

$290,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
44
Bidding Soon
614
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2024

April 15, 2024

Project location map

145th Ave & 87th St, Woodmohr, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.