BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Longmont, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000344255 SCOPE: The primary work to be performed under this contract includes full depth asphalt roadway construction, curb, and gutter reconstruction of the existing Coffman Street roadway from South of 2nd Ave to 9th Ave and the construction of raised, separated bike lanes, widened sidewalks, local and bus rapid transit bus stops, bus only traffic lanes, and landscaping. Construction includes full-depth asphalt roadway reconstruction, traffic signal installation, clearing and grubbing, grading, concrete flatwork, erosion control, signage, storm water piping, inlets and manholes, water service and hydrant construction, seeding and irrigation. All work occurs within an active downtown area with numerous businesses of various types, residential properties, and governmental properties. The Contractor shall supply all labor, materials, and equipment necessary to complete the work in accordance with the contract plans and specifications. This is a CDOT local agency project that includes both state and federal funding. This project has DBE & OJT goals. See specifications for more information. Disadvantaged Business Enterprise (DBE) Contract Goal: 8.5% Question Acceptance Deadline 03/15/2024 05:00 PM MT Questions are submitted online No Contact: Michelle Davis Email Address: Michelle.Davis@longmontcolorado.gov Telephone Number: 303-651-8343 Liquidated damages will be charged in the amount of $8,800 per day if the project is not complete as specified. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Federally Funded - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % A Bid Guarantee in an amount equal to 5% of the total Bid amount is required at the time of the Bid Opening. The Guarantee must be a Bid Bond executed by the Bidder on the City's own form, or a cashier's check payable to the City of Longmont. No Bid will be considered unless accompanied by the Bid Guarantee. The City of Longmont reserves the right to cancel this Invitation to Bid; reject any bid, in whole or in part; to adjust the quantity of Work to be done as mandated by budgetary requirements; and to waive informalities or irregularities in the bids received; when it is in the City's best interest to do so. 019622.000, 245500FF

Bid Results

Roads / Highways

$16,415,601.00

Public - City

Paving, Site Work

387

5

28

9

Subscribe For Documents

108 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
108
Bidding Soon
1,580
All Active Projects
642
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 28, 2024

April 29, 2024

April 19, 2026

img_map_placeholder

Coffman St, Longmont, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.