Renovation of a multi-residential development in Sault Sainte Marie, Michigan. Completed plans call for the renovation of a multi-residential development.

The Sault Tribe Purchasing Department will be accepting SEALED BIDS on behalf of the South Tribe Housing Authority for the Sault Ste. Marie Roof Replacement Projects and ordering Phase V Roofing Project., Replace roofs on twenty-two (22) units in Sault Ste. Marie MI to correct inadequate roof systems, repair moisture and ventilation issues and improve energy efficiency . The STHA reserves the right to reject any and all bids and to waive Informalities In the bids received whenever such rejection or waiver is to the best interest of the STHA. Native American and/or Tribal Preference w8l apply. If your company is claiming preference please supply supporting documentation showing Native American or Tribal ownership.. The STHA reserves the right to reject any and all bids and to waive Informalities In the bids received whenever such rejection or waiver is to the best interest of the STHA. Please read bid pack in its entirety. Any and all questions are to be submitted in writing to Ryan Madigan, phone 906-495-5555 email rmadigan@saulttribe.net or fax to 906-495-5981 Scope of work MUST be completed on or before October 30, 2024 *Bids must be submitted in a seated envelope clearly marked "Do Not Open - with Project number lasted as directed bid pack Duplex Unit Roof Replacement & Single Family Unit Roof Replacement Strip entire roof to the existing roof truss. o Remove existing shingles, roof felt, drip edge and roof sheeting. o Remove any existing siding as needed to properly install new plywood, ice guard and step flashing. Re-install siding as needed. o Dispose of any and all material at an approved landfill. o Removal of existing chimney chase which vents water. o Demo and remove existing chimney chase o Install new galvanized duct, storm collar and cape extending out from the roofline, 3 ft. o Install new roof boot as needed o Install Owens-Corning Batt R-49 Unfaced Fiberglass Insulation (equal or greater) entirely above ceiling deck insuring it covers the exterior wall area and does not interfere with any ventilation methods. Goal is to effectively reach energy reductions goals while cutting costs and carbon emissions. Progress pictures of installed insulation must be provided to STHA. o Install a new Duvont 24"x 44" Cardboard Attic Baffle (equal or greater) in every bay at eave allowing to vent proper. o Install new 5/8" OSB with approved H-clips to the entire roof surface allowing a twoinch gap at the ridge. o Install a 1 1/4 white galvanized drip edge. o Install ALCO Shield Granular+ Ice and Water Protector (equal or greater). o 2 rows at eve, 1 row in valley, 1 row on rakes, 1 row at side wall transitions o Step flash as needed when installing shingles making sure new flashing are properly weather lapped with the homes siding or exterior finish system. o Install Perma "R" ProFelt Plus Roof Underlayment (equal or greater) o Install an approved Landmark SwiftStart starter shingle starter strip (equal or greater) o Install CertainTeed Landmark 30 Year Architectural Shingles (equal or greater) Comply with manufactures instructions in full detail including each step-in sequence and accepted industry standards. o Colors will be black and brown per address. Address colors will be determined by owner and provided to contractor who is awarded the project o Roofing nails must be used and nailed per manufacture specifications. o Install new roof boots to code. o Install CertainTeed Ridge Vent - 12" filtered (equal or greater) to the entire ridge. o Install CertainTeed Shadow Ridge Hip and Ridge Accessory shingles (equal or greater). o The contractor is responsible for protecting the home from water damage in the event of a sudden rain storm during the project. Have protective plastic tarps ready (provided by contractor). o The contractor is responsible for any interior water damage during installation and must return to original condition o Contractor is responsible for protecting all vinyl siding during the project from breakage or markings from falling debris. Properly dispose of all debris and any and all waste using a large rolling magneton final clean up. o Site must be free of any and all debris, daily. o Progress pictures must be submitted with certified payroll. Location units- a. 2167 Migisa Ct. b. 2171 Migisa Ct. c. 2654 Waboose Ct. d. 2175 Migisa Ct. e. 2177 Migisa Ct. f. 2617 Atik Ameg Ct. g. 2658 Waboose Ct. h. 1841 Oshawan Dr. i. 1845 Oshawan Dr j. 1823 Oshawan Dr. k. 1825 Oshawan Dr. l. 1805 Oshawan Dr. m. 1807 Oshawan Dr. n. 1818 Oshawan Dr. o. 1820 Oshawan Dr. p. 1800 Oshawan Dr. q. 1802 Oshawan Dr. r. 2321 Shawano Dr. s. 2323 Shawano Dr. t. 2339 Shawano Dr. u. 2341 Shawano Dr. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Multi-Residential

$500,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
3
Bidding Soon
72
All Active Projects
21
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

April 15, 2024

img_map_placeholder

Multiple Locations, Sault Sainte Marie, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.