Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Laconia, New Hampshire. Completed plans call for site work for a playground / park / athletic field.
The Scope of Work is intended to give a basic description of the work to be performed the materials to be supplied, and the tasks to be completed by the contractor. It is intended to give the contractor a general overview of the project requirements. The successful contractor shall supply all equipment, materials and labor required for accessible mats to get to structures for ADA compliance. 1. Filter fabric for 8,000 sq. feet 2. Four hundred (400) yards of certified playground wood fiber mulch. 3. Wood fibers to be delivered to site. 4. Installation of ninety (90) mats and zip ties according to a layout plan provided by Ben Shaffer and installation instructions. 5. Installation of filter fabric and wood fibers in approximate area of 8,000 sq. feet. The City of Laconia Parks and Recreation Department is seeking Proposals for Levitt Park Playground Surfacing. Proposals will be received at the City of Laconia, Purchasing Office, 45 Beacon Street East, Laconia, NH 03246 Responses must be submitted in a sealed envelope clearly marked with your company's identification and labeled "Leavitt Park Playground Surfacing. The City of Laconia reserves the right to accept or reject any and/or all proposals or any part thereof, to waive any formality in the process, and to accept the proposal considered to be in the best interest of the City. Failure to submit all information called for may be sufficient grounds for disqualification. The City of Laconia reserves the right to cancel this request at any time for any reason. Scope of Work The Scope of Work is intended to give a basic description of the work to be performed the materials to be supplied, and the tasks to be completed by the contractor. It is intended to give the contractor a general overview of the project requirements. The successful contractor shall supply all equipment, materials and labor required for accessible mats to get to structures for ADA compliance. 1. Filter fabric for 8,000 sq. feet 2. Four hundred (400) yards of certified playground wood fiber mulch. 3. Wood fibers to be delivered to site. 4. Installation of ninety (90) mats and zip ties according to a layout plan provided by Ben Shaffer and installation instructions. 5. Installation of filter fabric and wood fibers in approximate area of 8,000 sq. feet. General Conditions 1. The submitting of a proposal by the Contractor is a representation that the Contractor has become familiar with the local conditions under which the Work is to be performed. 2. The term "Work" means the services required to complete the Work, and includes all labor, supervision, materials, tools, equipment, and services provided, or to be provided, to fulfill the Contractor's obligations. 3. All tradesmen shall be thoroughly experienced in the particular class of work upon which employed and the work and finished product shall be of a first-class quality. Employees of the contractor shall perform work that conforms to standard, state-of-the-art practices for this class and type of work. Once the project installation begins, by the execution of an Agreement, all work by the Contractor shall be completed in the most expedient manner possible. 4. The Contractor shall supervise and direct the work using the Contractor's best skill and attention. The Contractor shall be solely responsible for and have control over means, methods, and techniques for all portions of the work under the contract. 5. The Contractor shall be responsible to protect the worksite from any and all damages resulting from the work. 6. The Contractor shall comply with all Federal, State and Local safety and OSHA safety regulations. The Contractor bears the sole responsibility for protecting persons and property from injury or damage relating to the performance of this Contract. Bonding Performance and Payment Bonds are required when a construction or service contract is awarded in excess of twenty-five thousand dollars ($25,000). The following bonds or security shall be delivered to the City and shall become binding on the parties upon the execution of the contract: (1) A performance bond satisfactory to the City, executed by a surety company authorized to do business in the State of New Hampshire or otherwise secured in a manner satisfactory to the City, in an amount equal to one hundred percent (100%) of the price specified in the contract for the full term of the contract; and (2) A payment bond satisfactory to the City, executed by a surety company authorized to do business in the State of New Hampshire or otherwise secured in a manner satisfactory to the City, for the protection of all persons supplying labor and material to the contractor or its subcontractors for the performance of the work provided in the contract. The bond shall be in an amount equal to one hundred percent (100%) of the price specified in the contract for the full term of the contract. 1. A brief description of the firm and its related experience in similar projects including appropriate summaries of projects. 2. A minimum of two (2) references, with contact information, from customers who have contracted similar services. 3. Anticipated Schedule of Work. 4. A comprehensive cost proposal Selection and Evaluation Criteria After receipt of proposals, the City will evaluate the proposals and will use the following criteria in its evaluation: 1. Qualifications of the vendors. Considered in this category will be the: o Relevant experience of the vendor in installation and construction. o Reputation of the firm based on references. 2. Technical approach of the proposal to include responsiveness to meet or exceed the general specifications. 3. Proposed cost. Proposal evaluation criteria will be rated on a scale from (1) to (5), with (5) being the best. The firm with the highest proposal ranking (maximum of 20) will be selected to perform the services. If for some reason an agreement with the highest ranked firm cannot be reached the City will try to reach an agreement with the next highest ranked firm, and so on until an acceptable agreement is executed. Correspondence Please direct any questions to: Gina Roy or Amy Lovisek Purchasing Specialist Parks & Recreation Director City of Laconia City of Laconia groy@laconianh.gov Alovisek@laconianh.gov
Award
Playgrounds / Parks / Athletic Fields
$35,715.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2024
April 18, 2024
Bell St, Laconia, NH
Related To This Project
Laconia, NH
Bid Date: Mar 27 2024
Laconia, NH
Bid Date: Mar 26 2024
Laconia, NH
Bid Date: Apr 02 2024
Laconia, NH
Bid Date: Mar 28 2024
Laconia, NH
Bid Date: Mar 28 2024
Laconia, NH
Bid Date: Apr 10 2024
Laconia, NH
Bid Date: Apr 16 2024
Laconia, NH
Bid Date: Apr 26 2024
Laconia, NH
Bid Date: Mar 06 2024
Laconia, NH
Bid Date: Mar 06 2024
Laconia, NH
Bid Date: Feb 22 2024
Laconia, NH
Bid Date: Feb 22 2024
Laconia, NH
Bid Date: Feb 15 2024
Laconia, NH
Bid Date: Apr 10 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.