BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a civil project in Martinez, California. Completed plans call for site work for a water / sewer project.

As of April 25,2024, this project has not yet been awarded. A timeline for award has not yet been established. The work includes serving as the Project's on-site Construction Manager (CM) by providing construction contractor oversight, inspecting the work, providing quality control and quality assurance, ensuring contractor compliance with laws, regulations and mitigation measures, and reviewing contractor's payment requests. All questions regarding the proposal will be accepted through the site only. The deadline for submitting questions for this RFP is on or before March 15, 2024, no later than 3:00 P.M. PST. All questions will be answered and disseminated to those registered on the website. Contact customer service if you need technical assistance with any part of the proposal submittal process; support@bidsync.com or call (800) 990-9339. Contract duration: 3 years The Project is a joint effort by the County's Flood Control and Water Conservation District and Central Contra Costa Sanitary District (CCCSD.) The Project entails improving flood protection for the CCCSD wastewater treatment by raising the western levee along Grayson Creek and Walnut Creek between State Route 4 to the south and the BNSF railroad track to the north in Martinez, CA. Work includes placing and compacting fill to meet 500-year-storm flood protection levels with 3 feet freeboard, constructing concrete flood walls, reconstructing a concrete maintenance road, removing railroad tracks, replacing fence and gates, adjusting and relocating utilities, and coordinating work with CCCSD. Additional Project information is as follows: o Project No.: 7520-6B8348 o Estimated Construction Contract Cost: $4,900,000 o Estimated Construction Working Days: 95 o Anticipated start of constructio

Post-Bid

Water / Sewer

$4,900,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
90
Bidding Soon
1,881
All Active Projects
790
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

June 1, 2024

img_map_placeholder

Multiple Locations, Martinez, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.