BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a mixed-use development in Grand Forks AFB, North Dakota. Completed plans call for the remodel of a clubhouse / community center.

The contractor shall provide all materials, plans, travel, labor, equipment, and supervision necessary to do the following: 1. Equipment specifications and install locations and can be reviewed in detail on the attached layout and salient characteristics. 2. Area measurements required for equipment items built to specific sizes/dimensions must be obtained by contractor on site. 3. All equipment will be installed by a contractor in the coffee area and bar/snack area to include, but not limited to the following: a. Review drawings for approval with facility/CES prior to fabrication. b. Uncrate and move equipment into areas using a contractor supplied forklift. c. Set in place coffee counters, bar counters and snack bar counters and all related equipment. d. Assemble and set in place all counters and equipment. (ie; Coffee and cappuccino counters, condiment counter, back coffee counter and back bar counters, bar ledge counter) i. All counters pre-measured per site dimensions and custom built off site and assembled/installed on site. ii. Counters will have 3cm Caesar stone quartz top. e. Make utility connections to all proper sized utilities with valves and disconnects to within 6 ft. of terminating points on the same floor level. f. Assemble utility (keg/beer) cooler and set condenser on top of cooler. i. Make inter connections, lighting and coils as needed for final connections. g. Make final utility connections to all proper sized utilities with valves and disconnects to within 6 ft. of terminating points on the same floor level. h. Start up and test new equipment for proper operation. i. Dispose of debris in a contractor supplied dumpster. A site visit for this requirement has been scheduled for 1:00 PM Central Daylight Time, 11 June 2024, at 543 Holzapple St. Building 203 Grand Forks AFB, ND 58205. Parties interested in attending the site visit must express their intent to the contracting POC's listed below no later than 6 June 2024 to allow proper time to coordinate base access passes, if needed. All questions are due no later than 10 AM Central Daylight Time, 14 June 2024. Quotes are due no later than 11 AM Central Daylight Time, 21 June 2024. Quotes shall be sent via e-mail to the contracting points of contact listed below. Contracting points of contact: 2d Lt Amelia Wright, Contracting Specialist, (701) 747-6232 or email: amelia.wright.1@us.af.mil TSgt Richard Walls, Contracting Officer, (701) 747-3750 or e-mail: richard.walls.1@us.af.mil Scope of Work: The contractor shall provide all materials, plans, travel, labor, equipment, and supervision necessary to do the following: 1. Equipment specifications and install locations and can be reviewed in detail on the attached layout and salient characteristics. 2. Area measurements required for equipment items built to specific sizes/dimensions must be obtained by contractor on site. 3. All equipment will be installed by a contractor in the coffee area and bar/snack area to include, but not limited to the following: a. Review drawings for approval with facility/CES prior to fabrication. b. Uncrate and move equipment into areas using a contractor supplied forklift. c. Set in place coffee counters, bar counters and snack bar counters and all related equipment. d. Assemble and set in place all counters and equipment. (ie; Coffee and cappuccino counters, condiment counter, back coffee counter and back bar counters, bar ledge counter) i. All counters pre-measured per site dimensions and custom built off site and assembled/installed on site. ii. Counters will have 3cm Caesar stone quartz top. e. Make utility connections to all proper sized utilities with valves and disconnects to within 6 ft. of terminating points on the same floor level. f. Assemble utility (keg/beer) cooler and set condenser on top of cooler. i. Make inter connections, lighting and coils as needed for final connections. g. Make final utility connections to all proper sized utilities with valves and disconnects to within 6 ft. of terminating points on the same floor level. h. Start up and test new equipment for proper operation. i. Dispose of debris in a contractor supplied dumpster.

Award

Clubhouse / Community Centers

$248,141.00

Public - Federal

Remodeling

3

9

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
11
Bidding Soon
101
All Active Projects
53
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

August 19, 2024

img_map_placeholder

543 Holzapple St, Grand Forks AFB, ND

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.