BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Newland, North Carolina. Completed plans call for the renovation of a educational facility.

Avery County High School Kitchen Renovations. A bid security for 5% of the total bid amount shall be submitted with each bid. The laws of North Carolina and applicable regulations of various Licensing Boards and M/W/SBE provisions will be observed in receiving bids and awarding contracts. Prime Bidders & major subcontractors may receive a complete digital PDF set of plans and specifications upon request to the office of the Engineer. All the laws of The State of North Carolina shall apply to the bid opening and administration of the project. The Owner reserves the right to reject any and all bids, to waive informalities, and to award the contract to another bidder, other than the low bidder, should it be deemed in their best interest. All questions should be directed to the Engineer at the email Lynne@wolftrailengineering.com. 4. Permits: The contractor shall obtain all permits required for the project and obtain an occupancy permit. This includes all health and safety permits. 5. Existing Conditions: The building is will be occupied during construction during the month of May. 6. Demolition: 0) The kitchen equipment that is marked to be reused will be stored safely for re-insulation. 1) The walls and floor and ceiling and kitchen equipment and cooler & freezer indicated on the drawing to be removed will be demolished and removed from the site. 2) The plumbing will be removed back to pipe indicated on the drawing. 3) HVAC, remove of existing equipment and components of the HVAC. 4) Removal of the electrical as indicated on the drawings making it safe. 5) Removal of the plumbing system as identified on the drawings and as required the concrete flooring. 7. Renovation/New Construction: 0) The contractor shall perform all demolition required to install the new equipment and components of the project. 1) New block walls and concrete floor and flooring and patching the existing ceiling and doors and pass through windows shall be installed according the drawings and specifications. 2) New flooring shall be installed along with the new plumbing, HVAC, electrical, and ceiling shall be installed. 3) The owner shall provide all the work associated with the fire alarm system. 4) The kitchen equipment shall be installed and tested prior to training with the user/owner. The Kitchen Equipment sub-contractor shall test each piece of equipment and provide documentation that it was tested and it works according to the manufacturer's instructions. 5) Provide training for the kitchen staff including user manuals and warranty for each piece of equipment. 7) HVAC install equipment as indicated on the drawings, interface with the existing HVAC control system, testing, and training the owner on the equipment. 8) Plumbing - install equipment as indicated on the drawings. Install new grease trap. 9) Install new grease trap. 10) Electrical - install equipment as indicated on the drawings. 11) The gas lines in the kitchen shall be replaced. All the gas lines shall be removed from the exterior wall(s) to the new equipment. Paint all the gas lines with safety yellow.

Award

Educational

$1,900,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
102
Bidding Soon
1,393
All Active Projects
584
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 24, 2024

May 1, 2024

img_map_placeholder

401 Avery Co High School Rd, Newland, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.