BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Hawthorne, California. Working plans call for the renovation of a educational facility.

scope of work: Juan De Anza Elementary School was completely rebuilt in 2001. It is the only K-5 elementary school in the District. Organized along a main circulation spine connected to two classroom wings, Administration Office, Library, and Multi-Purpose Room. Spaces are connected through internal corridors. A building at the North part of the site and three (3) portables on the site house the Child Development Center. Minor modernization scope of work may include but is not limited to new flooring, ceilings, lighting, interior/exterior painting, doors, casework, tackable wall panels, restroom upgrades, mechanical, electrical, plumbing, audio visual technology, low voltage systems, and other finishes where needed as identified by Architect in consideration of the project budget and agreed upon by District. The Safety & Security scope of work may include but is not limited to new fencing and gates to support a secured campus, a secured main entry point into campus, door access controls for all existing and reconfigured spaces, fire alarms, public address and other communication systems, signage, exterior lighting on campus and within parking areas. The Project construction cost is estimated to be between $7.5 million to $8.5 million. Responsible Bidders Date = (Approved List of Responsible Bidders Announced) * 03/28/2024 Submission Cut Off Date = (Deadline for Application submission to Quality Bidders) * 03/21/2024 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The successful contractor(s) shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if awarded a contract for the Project(s) a Class B Contractors License that is current, valid, and in good standing with the California Contractors State License Board, and meet the minimum project requirements noted within the RFQ/P All questions, requests for explanation or clarifications of any kind in regard to this RFQ/P must be submitted via email to Sheere Bishop-Griego, Director of Procurement & Contract Management at sheere@nazconsultinginc.com no later than Noon on March 21st, 2024

Final Planning

Educational

$8,500,000.00

Public - City

Renovation

27

7

2

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
95
Bidding Soon
2,218
All Active Projects
975
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2024

June 1, 2024

img_map_placeholder

12110 Hindry Ave, Hawthorne, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.