BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Downey, California. Working plans call for the renovation of a educational facility.

As of April 2, 2024, the owner plans to reject all bids and re-bid again in the future. Maintenance of HVAC Systems and Installation of CO2 Monitors and HVAC Filters Contractor shall possess at the time of its bid, the following classification(s) of Contractors California State license(s): B, C20, C-36, or C-38. Bonds. A bid bond by an admitted surety insurer on the form provided by the District, cash, or a cashiers check or a certified check, drawn to the order of the District, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form, as a guarantee that the Contractor will, within seven (7) calendar days after the Notice to Proceed or other direction, enter into a contract with the District for the performance of the Services as stipulated in the bid. In addition, a one hundred percent (100%) Performance Bond and a one hundred percent (100%) Payment Bond will be required of the successful bidder. Any bid protest by any Contractor regarding any other bid on this Project must be submitted in writing to the District to Annie Aung, aaung@dusd.net, at before 5:00 P.M. of the SECOND (2ND) business day following the date of bid opening, or the Contractor waives its right to protest Question Deadline 03/18/2024 at 5:00 PM PT. Work shall be completed by April 30, 2024, Work shall be completed within 20 consecutive calendar days from the date specified in the District s Notice to Proceed (Contract Time). Contract Time & Liquidated Damages. Pursuant to Government Code section 53069.85, Contractor shall pay to the District, as fixed and liquidated damages for these incalculable damages, the sum of $500 per day for each and every calendar day of delay beyond the Contract Time or beyond any completion schedule, construction schedule, or Project milestones established pursuant to the Contract. The Districts Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received.

Final Planning

Educational

$1,634,149.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
107
Bidding Soon
2,296
All Active Projects
1,028
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

October 28, 2024

img_map_placeholder

Multiple Locations, Downey, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.