BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a clubhouse / community center in Fort Worth, Texas. Completed plans call for the addition of a clubhouse / community center; for the demolition of a clubhouse / community center; for the renovation of a clubhouse / community center; and for site work for a clubhouse / community center.

The addition & renovation of the existing Fire Station Community Center located near the intersection of 1601 Lipscomb Street and Maddox Avenue in Fort Worth, Texas, will be received by the Fort Worth City Hall, Purchasing Office, through online. the Selected Cmar Contractor Will Provide Pre-construction Services Including Constructability Reviews, Value Engineering Recommendations and Estimating Services Fees to Review During the Various Phases of the Design Process. Once the Construction Documents Are Completed, the Selected Cmar Contractor Will Provide a Guaranteed Maximum Price (Gmp) and Construction Performance Period for the Work. This Gmp Will Be Inclusive of Value Engineering and Estimating Services Fees, General Conditions, Construction Manager's Fee, Contingency, Bonds, Insurance, and Other Agreed Upon Costs; Plus, the City's General Contingency Allowance. The Total Construction Cost is Anticipated to Be Approximately $7,000,000.00, Refer to the "project Proposal Form" Found in the Instructions to Construction Manager-at-risk (Cmar) Offerors. The City of Fort Worth Will Negotiate a Pre-construction Services Contract and Later Negotiate a Construction Services Contract, Based on Percentages Established in the "project Proposal Form" With the Selected Cmar Firm Determined to Have Made the Best Value Offer. The Offeror Will Add a 7.5% Owner's Contingency Allowance on a Separate Line Item on the Proposal Form and Only the Owner Will Approve the Use of This Allowance During Construction. Any Allowance Remaining at the End of Construction Will Be Retained by the City of Fort Worth. This Allowance is Not to Be Included in the Base Proposal and Will Not Be Used in the Cmar Selection Process. The City Will Select the Cmar Contractor by Using a Two-step Request for Proposal (Rfp) Process. After Evaluating the Submitted Proposals From the Cmar Offerors, the City Will Shortlist, and Interview Up to Three Offerors. The City Will Then Select and Enter Into Negotiations With the Best Value Offeror. The City May Discuss With the Selected Offeror, Options for a Scope or Time Modification and Any Price Change Associated With Such Modification. The Business Equity Goal is 25% for the Estimated Construction Budget. There is No Goal for the Pre-construction Services. The Goal Will Be Applied to the Gmp When the Gmp Agreements Are Reached. Offerors Must Submit an Anticipated M/wbe Utilization Plan With Their Cmar Proposal Submittal. The Submitted Utilization Plan Will Be Part of the Weighted Selection Criteria. Refer to Instructions to Construction Manager-at-risk (Cmar) Offerors for Additional Information. Contact the Department of Diversity & Inclusion Office at (817) 392-2674 or Email Dvin_beoffice@fortworthtexas.gov to Obtain a List of Certified Subcontractors and Suppliers. Also, Refer to Section 3. Business Equity Provisions for Construction Manager at Risk (Cmar) Solicitation Upon Completing the Negotiations With the Selected Cmar Firm, the City Will Recommend to the City Council to Award the Cmar Contract to the Selected Cmar Firm Based on the Negotiations and the Agreed Upon Estimated Construction Budget. The Cmar Contract Will Be Adjusted Based on the Agreed Upon Guaranteed Maximum Price (Gmp) After the Design is Completed. The Selected Cmar Contractor Will Be Required to Provide Payment and Performance Bonds and Provide Contractors General Liability and Statutory Workers Compensation Coverage Once the Gmp is Agreed Upon. Cmar Offerors May Access the Instructions to Offerors, Any Addendum, Sample Contract, General Conditions, and Any Other Related Documents Through the City's Online Website and Can Be Accessed by Logging Onto: Online . Question Deadline 03/07/2024 at 5:00 PM CT The Last Day for Questions From Prospective Offerors is A Final Addendum Will Be Posted Friday, March 8, 2024. For Questions Contact the City Project Manager, Alfonso Meza, at 817.392.8274 or Email Alfonso.meza@fortworthtexas.gov for Assistance.

Post-Bid

Clubhouse / Community Centers

$7,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
94
Bidding Soon
3,561
All Active Projects
1,410
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

July 15, 2024

img_map_placeholder

W Maddox Ave & Lipscomb St, Fort Worth, TX

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.