BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Perris, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Contractor shall furnish all labor, material, tools, and equipment required for the complete construction of pipelines, manholes, clean-outs, and other allied structures and appurtenances as stated on the Bidding Sheets, shown on the Contract Drawings, and specified herein, all within the time as stated in the Contract Documents The work is comprised of the PVRWRF Biosolids Loadout Facility Improvement and Vactor Truck Dump Station Project. Prospective bidders should note that the work is defined as follows Schedule A – PVRWRF Biosolids Loadout Facility Improvement Project: The work comprises of construction to remove an existing biosolid hopper and install a new biosolid hopper on the existing structural frame, including stripping and recoating the existing structural frame, installing new lighting, electrical connections and control equipment, new water piping and drain connections and stripping, recoating, and reinstalling the existing work platform on top of the biosolids hopper; temporary removal, storage of two conveyors to facilitate installation of the hopper, reinstallation and testing of the conveyors after installation of the hopper, installing a truck scale facility including utility relocations, excavation and concrete work for construction of structural foundations, and installing a 100-foot long weighbridge, and associated electrical and control system; install and maintain a temporary sludge conveying system to convey solids from the existing belt presses within the Sludge Dewatering Building to the temporary loading area, inclusive of conveyors, supports, temporary removal and storage of a louver to facilitate installation of the temporary sludge conveying system, electrical and control equipment for the conveyors, structural supports for the conveyors, installing and maintaining temporary containment in the temporary solids loadout area, removal of all these temporary facilities upon completion of the permanent work and restoration of all aspects of the site disturbed by the temporary facilities. The work shall include, but not be limited to, all labor, materials, and supplies needed to replace existing biosolids hopper, install truck scale facilities, provide new or modify existing piping, electrical, and control systems, and demolition and properly disposal of existing equipment, piping, electrical, controls, and associated appurtenances, in accordance with these specifications and the contract drawings Schedule B – PVRWRF Vactor Truck Dump Station Project: The work comprises of furnishing and installing reinforced concrete structures for a Lift Station Cleaning Dump Station and Maintenance Dump Station. The work will include, but not limited removal and disposal of existing asphalt, existing concrete ramp, and existing above ground piping and concrete foundations; over-excavation and re-compaction beneath the structures; construction of the dump stations with associated piping, washdown water system, water monitors, mechanically cleaned bar screens, drop inlets, connection to existing recycled and potable water lines, furnish and install 4-inch water and 8-inch recycled water pipelines, 18-inch sewer pipeline and manholes; furnish and install a metal building for lime storage with an emergency eyewash station and electrical, controls, and associated appurtenances for the dump stations and yard lighting, in accordance with these specifications and the contract drawings License Requirements Classification A - General Engineering Contractor Liquidated Damages $1000.00 Estimated Bid Value $7.5 - $8.0 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Bond 10.00% Payment Bond 0.00% Performance Bond 0.00% Manhole frames and covers will be furnished by the Contractor upon prior approval by the District of shop drawings. Such prior approval by the District shall in no way nullify the District's right to accept or reject any individual unit as furnished or as installed. Online Q&A Yes Q&A Deadline 03/08/2024 5:00 PM (PST)

Award

Roads / Highways

$8,269,480.00

Public - County

Paving, Site Work

71

59

19

7

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
100
Bidding Soon
2,350
All Active Projects
1,113
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2024

June 10, 2024

img_map_placeholder

1301 Case Rd, Perris, CA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.