Site work for a bridge / tunnel in Leavenworth, Washington. Completed plans call for site work for a bridge / tunnel.
Eagle Creek Culvert Replacement Estimated range of probable cost for the base bid and all additive bid items is $1,085,000.00- $1,325,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions during the bid process should be submitted to both Hannah hannah.pygott@co.chelan.wa.us and Bryan bryan.maloney@co.chelan.wa.us Eagle Creek Culvert Replacement Project, Chelan County, WA. This contract provides for the removal of four fish passage barrier culverts on Eagle Creek and the installation of four 3-sided pre-cast buried concrete box culverts between river-mile (RM) 0.4 and 0.6 on Eagle Creek. The four project sites are referred to throughout the Contract Plans and these Contract Provisions by the last name of the adjacent Landowner. From downstream to upstream, the sites are referred to as "Downs (Lower)", "Downs (Upper)", "Loreth", and "Morton". This work includes, but is not limited to installation, maintenance and restoration of temporary construction access routes and staging areas; temporary and permanent utility relocation; temporary traffic control as needed to safely deliver, handle, and stage equipment and materials; structure, channel, and roadway excavation; in-waterwork requiring site isolation, temporary diversion of streamflow, shoring and dewatering as necessary; temporary erosion and sediment control; design, procurement, and installation of the new crossing structures; streambed and bank restoration; construction surveying required to perform the aforementioned tasks; and all other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the WSDOT Standard Specifications for Road, Bridge and Municipal Construction and addenda thereto.
Award
Bridges / Tunnels
$804,556.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 15, 2024
June 14, 2024
Eagle Creek Rd, Leavenworth, WA
Related To This Project
Leavenworth, WA
Bid Date: May 15 2024
Leavenworth, WA
Bid Date: Apr 12 2024
Leavenworth, WA
--
Leavenworth, WA
--
Leavenworth, WA
Bid Date: Jun 14 2024
Leavenworth, WA
--
Leavenworth, WA
--
Leavenworth, WA
--
Leavenworth, WA
--
Leavenworth, WA
Bid Date: Mar 14 2024
Leavenworth, WA
--
Leavenworth, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.